Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />FACILITY INFORMATION <br />Facility Name: WIGHT COLLINS ARCO I Date of Testing: 1-17-2012 <br />Facility Address: 130 S WILSON WAY STOCKTON CA <br />Facility Contact: Phone: <br />Date Local Agency Was Notified of Testing <br />Name of Local Agency Inspector (if present during testing): Thuy <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ® David A. Winkler ❑ Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3_ SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ vacuum ❑ Other <br />Test Equipment Used: h20 and tape measure <br />Equipment Resolution: 1/16 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 871 <br />2 872 <br />3 91 <br />4 <br />Bucket Installation Type: <br />❑ Direct Bury <br />® Contained in Sump <br />❑Direct Bury <br />®Contained in Sump <br />❑ Direct Bury <br />® Contained in <br />SumpSum <br />❑ Direct Bury <br />ElContained in <br />Bucket Diameter: <br />11 <br />11 <br />11 <br />Bucket Depth: <br />14.50 <br />14.50 <br />14 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (Ti): <br />9 <br />9 <br />9 <br />Initial Reading (Ri): <br />13 <br />13 <br />13 <br />Test End Time (TF): <br />10 <br />10 <br />10 <br />Final Reading (RF): <br />13 <br />13 <br />13 <br />Test Duration (TF — Tj): <br />IHR <br />IHR <br />IHR <br />Change in Reading (RF - RI): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16 <br />1/16 <br />1/16 <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended folloiv-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: V1 -6_j Date 1-17-2012 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />