My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 4:57:54 PM
Creation date
3/20/2019 4:29:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page_of <br /> SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> F Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Fiberglass Fiberglass <br /> Piping Material: Fiberglass Fiberglass Fiber g <br /> Piping Manufacturer: Arneron Ameron Ameron Ameron <br /> 3„ 3,> 4„ <br /> Piping Diameter: 3" <br /> Length of Piping Run: Approx. 160' Approx.20' Approx. 160' Approx. 180' <br /> Product Stored: Regular 87 Master Regular 87 Slave Premium 91 Gasoline Vapor <br /> Method and location of Test boot at Test boot at Test boot at Test boot at <br /> i in -run isolation: piping Sump#1&2 Piping Sump#1&2 Piping Sump#3 Fill Sump#3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> 11:45 11:50 12:00 <br /> Test Start Time: 11:40 <br /> Initial Reading(Ri): 5 Psi <br /> 5 Psi 5 Psi 5 Psi <br /> Test End Time: <br /> 12:40 12:45 12:50 1:00 <br /> Final Reading(RF): 5 Psi <br /> 5 Psi 5 Psi 5 Psi <br /> Test Duration: <br /> 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(R}Ri): <br /> 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: Pass <br /> Test Result: Pass Pass Pass <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.