Laserfiche WebLink
Page_of <br /> SWRCB,January 2002 <br /> 7. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1-87-Master Sump#2-87-Slave Sump#3-91 Sump#4-Vent Box <br /> rSumpeter: 42" 42" 42" 24"x 32" <br /> h: 33" 32" 33 '/�" 32" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 18" 15" 14" 19'/z' <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 11„ Electrical enters from <br /> 9„ 10" to <br /> Electrical Penetration: Dry <br /> Condition of sump prior to testing: Dry Dry a Dry <br /> W <br /> Portion of Sump Tested' Water Line 20" Water Line 17" Water Line 17" Water Line 22" <br /> Does turbine shut down when No <br /> sump sensor detects liquid(both Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed N/A <br /> Is system programmed for fail-safe Yes Yes Yes Yes <br /> shutdown?* <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 12:02 12:47 1:32 12:12 <br /> Initial Reading(Ri): .001 .001 .001 .001 <br /> Test End Time: 12:32 1:17 2:02 12:42 <br /> Final Reading(RF): <br /> 001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Rj): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass se <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />