My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 4:57:54 PM
Creation date
3/20/2019 4:29:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No` Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No` Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No` Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No` Were all probes reinstalled propedy? <br /> ❑ Yes ❑ No` I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No` Was the testing apparatus properly calibrated? <br /> ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> X Yes For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> X Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> X Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> N/A <br /> X Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> BOTH PLLDS PASSED <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.