My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991 - 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1991 - 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:23:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 1999
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A_ <br /> EMERGENCY PUMP SHUT OFF CHECKLIST <br /> FACILITY # / DATE 2:/ <br /> ADDRESS `4 <br /> ��- -T � AUS <br /> t, <br /> 1142 j9qj <br /> p9p• ENV 7`A L H <br /> i <br /> 1. Authorize one dispenser of each product and turn on the <br /> handle. <br /> 2 . ' Turn emergency switch on ARCOmatic to stop position. <br /> i <br /> 3A. Tokheim Dispensers Only <br /> Check turbine relays in power centers and relay boxes <br /> to verify that they are open and that power to the <br /> turbines is off. Note results below. <br /> 3B. Gilbarco & Wayne Dispensers Only <br /> Verify at least one dispenser of each product will shut <br /> off. Check turbine relay boxes to verify that they- are <br /> open and that power to the turbines areoff. Note <br /> results below. <br /> ARE RELAY 'S SEPERATE FROM POWER CENTERS? YES NO <br /> OK CLOSED COMMENTS <br /> E <br /> REGULAR RELAY <br /> UNLEADED RELAY <br /> SUPREME RELAY L <br /> Are there o her emergency pump shut-off switches? <br /> YES NO (IF YES) DO THEY WORK <br /> WHERE <br /> 4 . Turn emergency switch back to run position. <br /> 5. Put station back in operation. <br /> .6 . Install turbine circuit breaker decals that ar <br /> supplied by ARCO if necessary. <br /> CONTRACTOR SLcs�� SIGNATURE <br /> IF THERE ARE ANY PROBLEMS CALL ARCO MAINTENANCE IMMEDIATELY <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.