Laserfiche WebLink
DRAWING <br /> PRODUCT PIPING <br /> SP1 SITE PLAN <br /> PP1 BIO-DIESEL TANK/ PIPING LAYOUT <br /> PP1.1 PRODUCT PIPING, NOTES, SCHEDULES, AND INFORMATION <br /> PP2 UNDERGROUND TANK PLANS, NOTES, AND LEGEND <br /> PP2.1 EQUIPMENT SCHEDULES AND TANK MANUFACTURER'S DRAWINGS <br /> PP3 PRODUCT PIPING_, SECTIONS AND DETAILS <br /> PP3.1 PRODUCT PIPING SECTIONS AND DETAILS <br /> PP4 PRODUCT PIPING DETAILS AND SCHED'U'LES <br /> PP5 BIO-DIESEL INJECTION SHED SECTIONS AND DETAILS <br /> SITE ELECTRICAL <br /> ES1 SITE PLAN ELECTRICAL <br /> ES2 NEW BIO-DIESEL TANK CONTROL/ SENSOR WIRING DIAGRAM <br /> ES3 RISER DIAGRAM AND PANEL SCHEDULE <br /> ES4 PANEL WIRING DIAGRAM <br /> ES5 HEATER WIRING DIAGRAM <br /> R <br /> PILOT TRAVEL CENTER # 618 <br /> __ K TONE ROAD <br /> PROJE TSCO PE 1501 NORTH JA <br /> 1. ADD (1) 20,000 GALLON UNDERGROUND FIBERGLASS RIPON , CALIFORNIA 95336 <br /> BIO-DIESEL TANK. <br /> 00 <br /> wo 2. INSTALL BIO-DIESEL INJECTION SYSTEM. <br /> wo <br /> 3. TIE INTO EXISTINP DIESEL LINES WITH EXTENSION TO AND <br /> FROM BIO-DIESEL INJECTION SYSTEM. <br /> DEVELOPED BY <br /> m ° 4. STARTUP, CALIBRATION, AND LINE TIGHTNESS TESTING OF FUEL <br /> LANE ADDITION. -PILOT TRAVEL CENTERSLL' ,� <br /> 5. INSTALLATION AND CONNECTION OF ALL ELECTRICAL DESIGN <br /> REQUIREMENTS FOR INJECTION SYSTEM AND MONITORING <br /> ------------------- <br /> EQUIPMENT. 5508LONAS <br /> KNOXVILLE, TENNESSEE <br /> (865) 588-7488 <br /> AREA OF <br /> Li <br /> REMODEL <br /> PR <br /> OJECT CONTACT <br /> ------------------------------- 17- .:. JERROD HERRON <br /> 0 X, <br /> PROJECT E <br /> o <br /> PATRICK D <br /> PROJECT - <br /> \11111\ <br /> D <br /> ENPINEERS A CONSULTANTS <br /> DAVID M. LEFFER, P.E. <br /> edQa; o <br /> MECHANICAL ENGINEER <br /> JOHN D. FERGUSON, P.E. <br /> ELECTRICAL ENGINEER <br /> 0 <br /> SITE KEY PLAN - FOR REFERENCE ONLY <br /> PLAN 1 " - 20' <br />