Laserfiche WebLink
Documents prepared by Core �pFES$/0 <br /> States Engineering are to be used Q <br /> only for the specific project and ��.o���ECORE <br /> R�USo(� <br /> specific use for which they are 2 <br /> intended. Any extension of use to <br /> other projects, by owner or any 18497 <br /> other party, without the expressed, <br /> written consent of Core States i <br /> Engineering is done at the user's <br /> own risk. If used in a way other 1700 Industrial Drive,Suite B G R O U Pq��FCTR4f, <br /> than that specifically intended, user Rogers,AR 72756 <br /> will hold Core States Engineering Phone(479)986-4400iZL <br /> harmless from all claims and losses. FAX(479)986-4401 <br /> PANELBOARD: P (NEW) <br /> BUS AMPS: 125A <br /> MAIN SIZE/TYPE: 125A MCB GENERAL ELECTRICAL NOTES <br /> VOLTS/PHASE: 208Y/12OV, 3PH, 4W <br /> SERVES: 8100 1. AUTO AND TRUCK CANOPIES WILL BE PROVIDED WITH CONDUITS BY THE CANOPY <br /> LOCATION: B100 PUMP ROOM MOUNTING: SURFACE MANUFACTURER FROM A 3"X5" HANDHOLE AT 5'-0" AFF TO UP INSIDE COLUMN. RUN <br /> CKT DESCRIPTION VA PHASE WIRE I BKR 1PIPI BKR I WIRE VA/PHASE DESCRIPTION CKT CONDUITS FROM BUILDING UP INSIDE COLUMN TO THE HANDHOLE AND CONNECT TO CANOPY <br /> NO. A B C NO. AMP AMP NO. A B C NO. CONDUITS. <br /> 1 PUMP ROOM LIGHTING 108 12 20 1 1 20 12 180 PUMP ROOM RECEPT 2 2. CONDUIT SHALL NOT BE SURFACE MOUNTED ON CANOPY COLUMNS WITH THE EXCEPTION OF <br /> 20 1 1 20 12 1,500 PUMP ROOM HEATER 4 LK RECEPTACLES. <br /> 5 SPARE 20 1 1 20 SPARE 6 <br /> A37 SPARE 20 1 1 20 12 1,000 B100 CONTROL #1 8 3. ALL WIRING METHODS SHALL COMPLY WITH THE NEC ARTICLE 514. <br /> 20 1 1 20 12 1,000 B100 CONTROL #2 10 4. COORDINATE WITH PROCESS PIPING DRAWINGS AND VEEDER—ROOT SHOP DRAWINGS. <br /> 11 SPARE 20 1 1 15 12 200 EXHAUST FAN 12 LK <br /> 13 2,000 2,000 114 5. SENSOR CABLING SHALL COMPLY WITH VEEDER—ROOT SPECIFICATIONS. <br /> 15 B100 MOTOR #1 2,000 8 40 3 3 40 8 2,000 1B100 MOTOR #2 16 <br /> 17 2,000 2,000 18 6. EC SHALL CLEARLY LABEL ALL CONDUIT FROM THE CTS AND ELECTRICAL ROOMS TO INCLUDE <br /> 19 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 20 THE CONDUITS TERMINATION POINT IN THE FIELD. CONDUIT SHALL ALSO BE LABELED AT FINAL <br /> 21 ISPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 22 DESTINATION AS TO WHERE IT ORIGINATES. <br /> 23 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 24 <br /> 25 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 26 KEYED NOTES <br /> 27 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 28 <br /> 29 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 30 <br /> 31 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 32 01 CONTRACTOR SHALL PROVIDE NEW 100A, 208V, 3—POLE BREAKER TO FEED NEW 8100 BUILDING <br /> 33 ISPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 34 PANEL "P" ALONG WITH ALL THE NECESSARY CONDUIT,FITTINGS AND CONDUCTORS. <br /> 35 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 36 <br /> 37 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 38 O CONTRACTOR SHALL PROVIDE AND CONNECT NEW 100A, 3—POLE 250V CONTACTOR AHEAD OF <br /> 39 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 40 B100 MOTOR CONTROLLER TO EXISTING EMERGENCY STOP CONTROL SYSTEM. CONTRACTOR SHALL <br /> �� <br /> 41 SPACE AND PROVISIONS 1 1 SPACE AND PROVISIONS 42 SWITCH THE FEEDER CONDUCTORS FOR NEW B100 MOTOR CONTROLLER. MOUNT IN FUELING <br /> SUBTOTAL 2,108 2,000 2,000 3,180 4,500 2,200 SUBTOTAL E—STOP PANEL IN EXISTING BUILDING. <br /> TOTAL PHASE A — VA 5,288 LOAD CONN. VA DF LOAD CONN. VA DF O3 CONTRACTOR SHALL PROVIDE AND INSTALL NEW 60A, 120V-208Y, 4W, 3—PHASE B100 PANEL 'P'. ° <br /> AMPS 44 COOLING 0 REFRIGERATION 1.00 CONTRACTOR SHALL COORDINATE FINAL LOCATION IN FIELD WITH OWNER'S REPRESENTATIVE. <br /> TOTAL PHASE B — VA 6,500 HEATING 1,500 1.00 SIGN/DISPLAY 1.25 <br /> AMPS 54 LIGHTING 108 1.25 KITCHEN 1.00 <br /> TOTAL PHASE C — VA 4,200 RECEPTACLES 18011.0/.5. EXISTING 1 1.00 CODE NOTES How <br /> AMPS 35 MOTORS 114,200 11.00 LARGE MOTOR 1.25 TOTAL DEMAND <br /> TOTAL PNLBD — VA 15,988 SUPP HEAT 1 1.00 SHOW WINDOW 1.25 16,015 VA <br /> AMPS 44 MISC EQUIP 1.00 LTG TRACK 1.00 44 A <br /> LK- PROVIDE LOCKABLE CIRCUIT BREAKER <br /> LC- CONTROL WITH LIGHTING CONTRACTORS. <br /> (03 PANEL SCHEDULE G— PROVIDE GFCI BREAKER. N <br /> L— PROVIDE LOCK—ON DEVICE <br /> ES3LL] o NOT TO SCALE S— PROVIDE SHUNT TRIP BREAKER Q <br /> SWN— SWITCHED NEUTRAL/COMMON TRIP TYPE CIRCUIT BREAKER. ALSO, PROVIDE CIRCUIT 0 C0 <br /> BREAKER HANDLE PADLOCK ATTACHMENT. <br /> P— CIRCUIT BREAKER PADLOCK ATTACHMENT FOR LOCKING BREAKER IN THE "OFF" POSITION. J U L1J <br /> H— PROVIDE HANDLE CLAMP FOR LOCKING CIRCUIT BREAKER IN THE "ON" POSITION. D z <br /> QQ O Q <br /> HA- PROVIDE HACR TYPE BREAKER. 2 z <br /> aU > U � <br /> Q co Q QO <br /> crW <br /> PERSONALLY INSPECT THE SITE OF THE PROPOSED <br /> U Q U <br /> WORK AND BECOME FULLY INFORMED OF 0— __D Cl:� ^ <br /> CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. Q O z <br /> FAILURE TO DO SO WILL NOT BE CONSIDERED Q z 0 <br /> SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN 7— — <br /> EXTRA COMPENSATION OVER AND ABOVE THE 0 OL� <br /> 120V BRANCH CIRCUIT CONTRACT PRICE. FIELD VERIFY ALL EXISTING 7- <br /> CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. I� <br /> EXISTING <br /> E-STOPS <br /> O <br /> ET1 ET2 EXISTING FUELING CT-BD NEW B100 MOTOR CONTROLLER <br /> CONTACTORS <br /> O <br /> CT—BD NEW B100 MOTOR CONTROLLER <br /> Q <br /> w <br /> EXISTING FUELING (LEXISTING � EXISTING NEW <br /> CONTACTORS 120/208V FUELING 125A 3 Cc <br /> DISTRIBUTION PANEL PANEL <br /> W <br /> PANEL NP1 <br /> co <br /> W � <br /> ® o _J <br /> U � <br /> W m <br /> o I <br /> r2 Ocn <br /> U Q <br /> CT BD <br /> 1 100A � � <br /> 01 1 0=0 A N "' <br /> NEW B100 STP <br /> 14 ® Q CO p N <br /> p I r4) <br /> O o 0 <br /> CT BD <br /> NEW B100 STP (4)#3, (1)#8G, 1-1/4"C. <br /> UPSIZE PER NEC IF <br /> DISTANCE EXCEED'S 200' <br /> SHEET <br /> (_62 ESTOP DIAGRAM 01 POWER DISTRIBUTION DIAGRAMS <br /> ES3 NOT TO SCALE ES3 NOT TO SCALE <br /> /2\ <br /> 15 <br /> L <br />