My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:43:05 AM
Creation date
3/22/2019 9:37:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOLC PROCEDURE BELOW, STEP 11 B : PREPARE DRILL AND BIT <br /> FOR 71 SO-TOOL, SEE PAGE 8 Confirm that the stop on the 3/16" drill bit supplied <br /> FOR 71 SO-TOOLCT, SEE PAGE 10 with the 71 SO-TOOLC is in the correct position before <br /> — drilling. The stop is factory installed at a distance be- <br /> Note: 71 SO-TOOLC can only be used with testable tween 1 -3/16" to 1 - 1 /4" from the tip with the 71 SO- <br /> overfill valves if modified as shown below. TOOLC. If the stop is not at the correct position it must <br /> be fixed before drilling . <br /> - j CAUTION: If the drill stop is not in the proper loca- <br /> =. tion failure of a pressure decay leak test may result. <br /> 7150-TOOLC <br /> I - 7 � <br /> u 4 <br /> i r <br /> I i <br /> I <br /> Add a 10-24 UNC thread or similar <br /> to all three legs of the 71 SO- Tip to stop dimension must <br /> TOOLC in the area shown. Use set be 1 -3/16" to 1 -1 /4" <br /> screws to secure tool to upper Figure 118 <br /> tube. <br /> STEP 126: DRILL HOLES <br /> 71 SO-TOOLC Modifications for Testable Inlet With the inlet tube and 71 SO-TOOLC in place, carefully <br /> drill a 3/16" diameter hole in the upper tube using the <br /> STEP 9B: INSERT 71 SO-TOOLC OVER INLET TUBE hole in the 71S0-TOOLC as a guide. The drill stop is po- <br /> To install the 71 SO-TOOLC (sold separately) over the sitioned so it will bottom out against the tool after the <br /> inlet tube, first loosen the thumb screw, so the tool can bit has drilled through the upper drop tube. If the stop <br /> pass freely over the inlet tube flange. Align the slot on is positioned wrong either no hole will be drilled, or a <br /> the tool with the key on the inlet tube and insert the through hole could potentially be drilled through the <br /> tool down . See Figure 9B. inlet tube. If no hole is drilled return to step 11 B and <br /> check the stop dimension . If a hole is drilled through <br /> Tool Slot Hand tighten thumb screw the inlet tube or into the screw hole the assembly is not <br /> foo . salvageable. Drill (2) more holes in the two remaining <br /> - ----- - guide holes. <br /> thumb <br /> screw <br /> Net <br /> Tube If"j I <br /> Key 11 <br /> OA/ through upper lube only <br /> STEP 1066 TIGHTEN THE 71 SO-TOOLC Figure 12B <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube. To prevent vertical movement of the tool during <br /> drilling, hand tighten the thumb screw against the up- <br /> per drop tube. See Figure 1 OB. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.