My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 9:43:05 AM
Creation date
3/22/2019 9:37:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . To determine lower tube distance from tank <br /> bottom to bottom of cut: <br /> Subtract valve length (W) from distance to tank <br /> bottom (B) <br /> (V) = (B) — (W) = <br /> Cast lug <br /> Note: Lower tube clearance must meet tank manufac- in 71 SO <br /> turer requirements and all AHJ, local, state, and national / body <br /> codes. Typical clearance is about 4". If lower tube clear- ✓/ Float direction <br /> ance is not met valve must be removed and adjusted to <br /> meet these requirements. <br /> 3 . To determine lower tube distance from tank <br /> bottom to top of cut: <br /> Subtract valve length (U) from distance to tank <br /> bottom (B) <br /> (T) = (B) — (U ) = <br /> View into drop tube from above <br /> Note: Lower tube distance from tank bottom to top of <br /> cut must meet all AHJ, local, state, and national codes. <br /> For reference per 40 CFR 63 subpart CCCCCC / NESHAP <br /> the lower tube can be no more than 6" from the bottom <br /> of the tank. If lower tube distance is not met valve must <br /> be removed and adjusted to meet these requirements. <br /> 4. To determine float alignment: <br /> Looking into upper tube (see figure) the float should be <br /> aligned along the length of the tank. If float is not <br /> aligned properly adjustments need to be made. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.