Laserfiche WebLink
ti r <br /> ARCO Products Company <br /> Environmental Health & Safety <br /> 4 Center , Cali Drive <br /> IN OF <br /> La Palma, California 90623-1066 _ <br /> Mailing Address: Box 6038 <br /> June 30, 1998 <br /> Artesia, California 90702-6038 <br /> ): 34 <br /> it <br /> San Joaquin Co. Env.Health -TaArn.tc� �o� �Acstrn��e. <br /> 304 E. Weber Ave, Third Floor AAA-0%1% <br /> Stockton, Ca. 95202 <br /> Attn: Insp. Letitia Briggs <br /> Re: Inspection Report dtd 6/22/98: Arco SS# 2186, 3212 N. <br /> California, Stockton <br /> Dear Letitia: <br /> Reference above subject in which you stated that the existing tanks at the <br /> site does not meet 12/22/98 UST requirements, because of a Unauthorized <br /> Release Report filed 8/30/95. The following are the facts regarding the <br /> UST's at this time. <br /> 1 . The tanks and lines are single wall fiberglass installed 9/1/72. <br /> 2. The tanks & lines have passed their annual test regularly. The most <br /> recent being on 12/22/97 with copies forwarded to Doug Wilson on <br /> 2/19/98. <br /> 3. The system only lacks positive shut down and overspill boxes to meet <br /> the 12/22/98 UST standards. We will be applying for permits to <br /> install this equipment prior to 12/22/98. <br /> The 8/30/95 Unauthorized Release Report was submitted because soil <br /> contamination was found by 01-lr Consultant (Emcor.). It is our policy to <br /> perform the sampling when it is possible we may permanently close the <br /> station or return it to the property owner. The release found was not <br /> specific to the UST system...in fact the report states that our recent tank & <br /> line tests on 1/24/95 found the system tight. <br /> Since the report was filed our remediation department and environmental <br /> consultant, Pinnacale, has been working with Carol Oz, San Joaquin Co. <br /> Env. Health on the findings and on a County Vertical Assessment request <br /> (which is common to all water wells in the area). The site has 4 ground <br /> water and 2-3 vapor extraction wells and only water sampling is being <br /> performed at this time. In fact there has been minimal (almost non-existant) <br /> traces of MTBE found in 1 of the water wells; which supports that the tank <br /> & lines are not leaking. <br /> APC-7116 <br /> ARCO Produds Company is a Division of AllanlicRichfleldCompany (10/96) <br />