My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1761
>
1600 - Food Program
>
PR0535526
>
COMPLIANCE INFO_2017-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:00:13 PM
Creation date
3/25/2019 9:28:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2019
RECORD_ID
PR0535526
PE
1618
FACILITY_ID
FA0020482
FACILITY_NAME
MI MERCADO TODO SANTERA
STREET_NUMBER
1761
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721002
CURRENT_STATUS
02
SITE_LOCATION
1761 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The EHD must be kept informed of the construction progress. A final inspection <br /> must be performed, operating permit fees paid, and approval to operate granted <br /> prior to opening for business. All equipment must be installed and thorough <br /> cleaning completed prior to the final inspection. Inspections must be scheduled <br /> at least 48 hours in advance. Charges for additional inspections, re-inspections <br /> and/or consultations may be assessed at the EHD hourly rate of $ 98.00 per <br /> hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in <br /> compliance with applicable State laws, and/or city or county ordinance codes, shall be <br /> constructed or reconstructed upon request of the EHD. Inferior workmanship, <br /> equipment, or materials will not be accepted for the construction or operation of a food <br /> facility. Any variance from the requirements outlined in this letter will require written <br /> approval from the EHD. Approval of the submitted plans shall become null and void if <br /> the work authorized is not commenced within 180 days from the date of approval, or the <br /> work authorized by such plans is abandoned. In order to renew action on an expired <br /> plan approval, the applicant shall submit fees equal to that of a new plan review. A <br /> copy of the approved plans shall be available on site at the time of final inspection. <br /> If you have any questions, please contact Vidal Pedraza, Registered Environmental <br /> Health Specialist (REHS), at (209) 468-0334. <br /> Donna Heran, R.E.H.S., Director <br /> Environmental Health Department <br /> Jeff Carruesco, R.E.H.S. <br /> Program Coordinator <br /> Plan Check <br /> 09/06/2007 -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.