Laserfiche WebLink
06/09%1999 15.07 714670-54211 EFS AROD L"ti PALMA PAGE 02 <br /> MONITORING ANIS RESPONSE PLAN - X <br /> ARCO PRQDUCTS COMPANY FACILITY WITH <br /> SECONDARY CONTAINMENT OF <br /> ,YWROUND STORAGE TANKS & PRODUCT LINES WITH <br /> Sl <br /> IBMIEW BLE PUMP SHUTDON'v-N <br /> ARCO Facility-. -0,�_ Address: <br /> this plan is designer to meet the J.nonitoring and response requireinents of Section 263^. :-article _, <br /> Tit'h: 23, CCR <br /> T�?$ING V01"IP1VIENT <br /> Secondarily contained storage tanks and lines at ihis facility are monitured by a cominuous <br /> electronic leak detection system.whic:tt consists of an alarm panel, sensors at�d associated <br /> electronics. Liquid sensors are installed Mi the annular space of each double wall tank-acid <br /> product line piping sump. Whenever a sensor detects the presence of a liquid there is both a <br /> +risua.l and audible alarm at the c--ntrol panel. In addition, the continuous rronitor on the <br /> pro&ict piping system will shut down the pump and activate the alarm system when a <br /> release is detected or if the continuous product piping monitoring systean fails or is <br /> disconnected, the pum.Ping system will shut down. <br /> Automatic line leak detectors are installed on ttLe secondarily contained pressurized product <br /> piping, The line leak detector will detect a ioss of pressure in the product lines and xestrict <br /> the flow of product. <br /> 2. MAI ,SQW�L'LE OF MONITORING EQUIPMENT <br /> The continuous electronic leak detection system includir_g line leak detectors N01i be <br /> inspected according to the manufacturers instructions by an outside contractor once during <br /> each.calendar year. <br /> 3. ROUTCNE NIONITOWNG PROCEDURE <br /> On a daily basis the facility operator shall: <br /> A. Inspect the control panel for visual and audible alarm signals to confirm that <br /> the unit is operating. <br /> B. Inspect island and tank-rill area-,for signs of spillage or petroleum sheen. <br /> C. Record the iuspectior,observations on the Daily VISLL1 Monitoring Log <br /> (Form APFC-765: attached.) <br />