Laserfiche WebLink
06/09/1999 15:07 7146705420 EHS ARCO LA PALMA PAGE 03 <br /> 4. RESPOME PLAN <br /> QLPERATQR RESPONSIBILITIES <br /> A. LEAK RECORDING AND REPORTING PROCEDURE <br /> Whenever an rlarn1 is activated, station personnel are to immediately: <br /> a. Contact ARCO Maintenance or its designated agent by using the <br /> telephone number previously provided. <br /> b. If any visible indications of petroleum products or vapors are noticed <br /> call 911. <br /> c- Mske an entry in the Recordable Discharge Log(Form APPC-765-1 <br /> attached)indicating the action taken <br /> d. Complete the Recordable Discharge Log when and as the Source of <br /> the,alarm is known. <br /> ARCO R 4NSIBILIT_JES <br /> B. METHOD OF REMOVING AN UNAUTHORIZED RELEASE FROM THE <br /> SECONDARY CONTATNI.SENT <br /> a. Any unauthorized release into the secondary containment system of a product <br /> tank will be removed by pumping_ Uneontau dnated product may be returned <br /> to the tank. Contaminated product may be returned to the refinery to be <br /> recycled or may be disposed of following procedures in accordance with <br /> California Health Safety Code requirements. <br /> b. ARCO Maintenance will be responsible for authorizing and selecting <br /> contractors for the work to be performed. <br /> 5. T1iAINING <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br /> needed for the operation of the tank system and monitoring equipment includes: <br /> How to: <br /> Take tank level :measurements <br /> Read dispenser meters <br /> Inspect equipment <br /> Recognize warning signs: dispenser hesitations, meter spins and odors <br /> Manually close dispenser impact valve <br /> Replace dispenser filters <br />