My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 2:07:38 PM
Creation date
3/25/2019 4:40:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
....r .... . ......... . 1. . - - . . :l:•. ! ..... . .:.1. 1 . <br /> SYSTEM PRIM TSET INFORMATION <br /> x Four complete sets of plans (To include specification sheets arid/or equipment brochures if not on file). <br /> Plans drawn to scale in non-erasable print. <br /> Plot plan to show Location and number of tanks. <br /> Tank cross-sectional diagram included on prints submitted. <br /> Detail of tank, piping system, excavation and cover. <br /> Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) a 26351 <br /> Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> Manufacturers written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> Tightness Test (NFPA 30) is required an both primary (10) and secondary (20) containment systems before covering. <br /> [Section 2635 (b) (6) a (7)] <br /> Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (T)] <br /> NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health a Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> TANK COMPOSITION <br /> JK ! ! ! 2 ! ! ! <br />)ACITT 1 <br /> 4UFACTLIRER �.( L_ Z <br />(POSITION — \ - L <br /> IEL <br />'DUCT 1 2 <br />:ROSION PROTECTION �- <br />.. LISTED <br />'PATIBILITY WITH 100% <br /> HANOL y 5 C <br /> TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> D. Non-clad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.