Laserfiche WebLink
NEW UST. It' 'ALLATION INSPECTION REC*7 <br /> FACILITY XAME: C 2 ADDRESS: _ <br /> l � � LA NJ E <br /> SLEEPS? TAN= ULt TANG MDDEL/NATERIAL: <br /> CAPACITY: PRODUCT: R.E.H.S: <br /> A I <br /> P N ALL TAXKS TO BE INSTALLED AND TESTED III ACMMAIICE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EGi1IPMP][T INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCt 2635 (D) (8) <br /> I2. UST INSTALLATION PLANS APPROVED (CCR 2MS (E) C3)) <br /> INITLIL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: S3AP: m: RRS/NIN: BRINE(LIQUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: PSI: USIWIN: <br /> 5. TANK APPROPRIATELT PLACED WITR APPROVED BACITILL (CCR 2635 (A) (3) (4) (6)/ APIIPEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CC2 2635 (8) (4)) <br /> T. SECONDARY PIPING CORAINNENNT TEST PSI: HRS/MIN: OTHER: (CCN 2635 (A) (4)) <br /> RI. LIKE TEST ON ALL SL PS (24 HR. MINIMRM) HRS: (CCR 2635 (A)) <br /> 9. LOAM TANK OPENINGS SEALED AMD CION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST CCCR 2635 CA) (4)) <br /> 1i. ALL PIPING AND FITTINGS CCRR13SION PROTECTED C= 2635 (8)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR •ALL' MONITORING PROBES (CCT 2632 (C) (2)) <br /> I13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE= TEST OF LINE LEAK DETECTION (MSR 2632 (D) 2x35 (8) (5)) <br /> 15. PERFORKANCE TEST OF AUTOMATIC RSP SYSTEM SHUT-OFF (CCR 2635 (8) CS)) <br /> 16. SALL.FLOAT VALVES INSTALLED (CQ 2635 (8) C6)) <br /> 17. OVERFILL PROTECTION INSTALLED/APPROVED (CCG 2635 CE) (2)) <br /> 18. TANK ACCESS PORTS BRO QIT TO GRADE (LLCED AND WATERTIGHT) (CCG 2631 (D) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPO[SE PLAN AMD LOG BOOL ON SITE (CCR 2632 (E) (1) C2)) <br /> 21. 0" FORM COMPLETED AND SLMMITTED (CCT 2635 (E)) <br /> 22. MONITORING METHOD FOR ALL TANKS AMID PIPING APPROVED (CCR 2641-2646) <br /> 23. ALL CO DITICMS MET; FACILITY PERMIT ISS: (H+S CODE 25284 (E) (F)) <br /> 41ENTS: <br /> x446 3/92 (REVISED 11\92) <br />