My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 2:07:38 PM
Creation date
3/25/2019 4:40:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BAcxFu-L EXCAVATION CERTIFICATE <br /> jest Location _ L R L U <br /> `� <br /> ner — Phone No. <br /> xtractor � Se)�l C c Phone No - 43 License No. 2 <br /> INDICATE METHOD OF BAC FM.L QUALITY ASSURANCE <br /> L Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />_,,Z. Submission of�ver� , e�, load ticket,within 30 days of project completion that one of the following materials <br /> was placed to <br /> A. Pea gravel—smooth, rounded material not more than one-half(12) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> or <br /> on <br /> ere5v certify that a Soil Engineer's aterial desrnbed ort wi <br /> abovction e will be placed at submitted <br /> o five (5�within 30 days of project <br /> c yardsper completion.000 gallon tank <br /> vertncation that the select <br /> placement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> de Appendix Chapter 70. <br /> C t <br /> • Name rind <br /> lide ( tint <br /> Signature <br /> Shall be the responsible managing employee on the license or authorized agenL <br />
The URL can be used to link to this page
Your browser does not support the video tag.