Laserfiche WebLink
• �`-•v4�:��"i:^Sn;Si':.FI�X%s•._`^A A .\/ ,/.■�■. /\A7A^/' <br /> Cti:A :�1Y <br /> MECHANICAL CONTRACTORS <br /> _ 1717 Doolittle Dme <br /> - P.O.Box 5555 <br /> - San Leandro.California 94577-0655 <br /> (510)895-2333 <br /> u;= �.+`,�-�,�_�,���o,,�� ;• Contractors License No. 184480 <br /> October 5, 1998 <br /> San Joaquin County Department of Environmental Health <br /> F.O. Box 388 <br /> Stockton, California 95201-0388 <br /> Attention: Leticia Briggs <br /> Regarding: ARCO Facility Equipment Upgrades <br /> Ladies and Gentlemen: <br /> Scott Co. of California has been contracted by ARCO Products Company to perform upgrades <br /> on some of their fueling stations. <br /> In your jurisdiction, we will perform the following work. <br /> 1. ARCO #2186 3212 N. California,Stockton <br /> • Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br /> • Overfill prevention on all fills with tank bottom protectors <br /> Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br /> 2. ARCO #4932 16 E. Harding,Stockton <br /> • Overspill prevention on 311 fill and stage I vapor lines <br /> • Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br /> • Overfill prevention on aB fills with tank bottom protectors <br /> Enclosed are the necessary permit fees,submittals on the equipment to be installed and permits <br /> for all sites at $234.00 each for a total of$468.00. ARCO willsubmit all necessary forms A, B <br /> and C upon completion of the project(s). <br /> Should you have any questions and/or comments, please do not hesitate to can me at (5 10) <br /> 895-2333,extension 385. <br /> V ly yours, <br /> C'Z77-0. O A <br /> F��a <br /> Environmental Estimator/Project;Manager <br /> C.:/sco tteo/jobs/tank/Lp tO9018san j oaqu i n <br />