Laserfiche WebLink
11/24/98 10:50 N0.998 D01 <br /> ITCQ <br /> MECHANICAL CONTRACTORS <br /> 1717 owume onve <br /> P O.Box 5555 <br /> San Lesndm Coleomie 94577-0655 <br /> g7g ($IQ)895.2333 <br /> Contractor!Ucanas No,184480 <br /> San Joaquin County Department of Environmental.Health <br /> F.O. Box 388 <br /> Stockton,California 95201-0388 <br /> Attention: Leticia Briggs <br /> Regarding: ARCO Facility Equipment Upgrades <br /> ladies and Gentlemen: <br /> Scott Co. of California has leen contracted by ARCO Products Company to perform upgrades <br /> on some of their fueling stations. <br /> In your jurisdiction,we will perforin the following work <br /> 1• ARCO #2186 3212 N. California,Stockton <br /> • Product litre monitoring system urstallation for conturual litre monitoring and <br /> turbine shutdown. <br /> • Overfill PMvW ion on dll fills with tank bottom protectars. <br /> terrr'�' s r <br /> ?. ARCO#4932 16 E. Harding,Stockton <br /> • Overspill prevention on all fff acrd staSe I vapor Imes <br /> • PtWuct line monitorir;g system installation for continual line monitoring end <br /> turbine shutdown. <br /> • Overfill prevention on aft fills with tank bottom prvtectors. <br /> Enclosed are the necessary permit fees,submittals on the equipment to be installed and permits <br /> for all sites at$234.00 each for a total of$468.00. ARCO will submit all necessary forms A,B <br /> and C upon completion of the project(s). <br /> Should you have any questions and/or comments,please do not hesitate to call me at (5 10) <br /> 895-2333,extension 385. <br /> ovironmental <br /> s, <br /> CALIFORNIA Post-if Fax Note 7671 Date�� R>a pages► <br /> To C ^ From P \ <br /> Co./Dept.Estimator/Project Manager Ph r o 8-343 Phone <br /> FaX 4 Fax W <br /> G:/7CapSo/dobe/tattk/t.pW9p1 Exnjosquin <br />