Laserfiche WebLink
NEW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: ADDRESS: <br /> FACILITY ID# TANK1 UL,- TANK MODEL/MATERIAL: <br /> CAPACITY: -) G PRCDUCT: R.E.H.S: <br /> A I <br /> P y ALL TANKS TO 3E INSTALLED AND TESTED IN ACCORDANCE <br /> p I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED A <br /> DATE <br /> 1 1. UST PLANS SUBMITTED/ FEES ?AID (H+s CODE 25287) <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> 1 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: S HRS/MIN: BRINE(LIQUIO ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: Psi: HRS/MIN: <br /> 1 5. TANK APPROPRIATELY ?'LACED WITH APPROVED 3ACKFILL CAPI/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 ,MIN) (CCR 2636 (e)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR_ MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> 1 I 9. UNUSED TANK OPENINGS SEALED AND CORROSION ?ROTECTED ?EI <br /> ' I10. OVERSPILL PERFORMANCE 'EST (CCR 2635 (b) (1) (C)) <br /> 111. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> i 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> I13. PERFORMANCE TEST FOR "ALL" ,MONITORING PROBES (CCR 2632 (c) (2)) <br /> 1 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br /> 15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 Cc) (1)) <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br /> 1 17. BALL FLOAT VALVES INSTALLED <br /> 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> 20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> I21. MONITORING PLAN, RESPONSE ?LAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 1 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 123. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> 124. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br /> I <br /> COMMENTS: <br /> EH23-006 9/95 <br /> 10 <br />