„ <br /> w <br /> Sheet Note84 _ TI H N H SEALING �. <br /> TESTING OF T F SECONDARY CONTAINMENT PIPING IS REQU1RLmmEa, THE SEAL., 13. ALL U.G. CONDUIT TO TANKS SHALL B , SCHEDULE 1 <br /> . C� EDL LE 4C). PVC CONDUIT MAY (�� SUBSTITUTED <br /> a S -,� A CERTIFICATE OF APPROVAL SHALL BE FURNISHED WITH EACH PREFABRICATION � r °_ � <br /> BOOT IN THE, �UMf-� l TO r� INTAI.t�F( WITH THE VALVE 1� R�I (� f��INN. 6��Tf� ASSEMBLY FOR GALVANIZED EXCEPT FINAf.. C TO ANY LOCATION, FVC CONDUIT � ; <br /> ` � . CERTIFYING THAT - � Ax C DUIT MINIMUM BURY <br /> TESTING THE VALVE IS TO BE OPENED TO ALLOW DRAINAGE F THE SECONDARY ER NG HA THE ASSEMBLY OR STRUCTURE IN QUESTION HAS BEEN INSPECTED MEETING <br /> DEPTH TH f PER <br /> D O E F CODE, <br /> 1. -- SUMP PIPING PENETRATIONS SHALL BE MADE USING BULK HEAD FITTINGS S THE REQUIREMENT OF THE CODE. <br /> ELECTRICAL- PENETRATIONS SI-'CAL.I. �� MAGE PIPING TO THE ,SUMP MONITOR PRBEW <br /> ("ENVIRON-), 14, - ALL RI ERS SHALL BER ' N <br /> COU DED AND BONDED PER DETAII.. #4 ON DWG. TKA--_ a <br /> WITH APPROPRIATE AIR TIGHT COMPRESSION FITTINGS WITH SEAL­-OFFS. D. AL_I_ PENETRATIONS OF THE SUMP TO BE ON A LINE TOWARD THE RENTER OF THE SUMP 9, TANK STABILITY SHALL BEHECK AGAINST T <br /> LE. ENVIRON , TO ENSURE THE PROFFER INSTALLATION OF ALL BULKHEAD AND COMPRESSION FITTINGS AND C � ED ACI ST FLOA ATION. » <br /> RESULTANT WATER TIGHTNESS, ALL PIPING CONDUIT AND CR k3N1S THAT F>ENETRATE 15. T”` FOR A 20,OOO GALLON 1C} DIAMETER TANK, THE ANNULAR <br /> O '10, NOT USED. SPACE RISER IS LOCATED ON THE FILL SIDE AS SHOWN. <br /> 2, - THE HEIGHT OF PENETRATIONS INTO SUMP FOR SIPHON PIPING VARY BETWEEN TANKS. THE SUMP SIDE WALLS MUST BE SEALED IN SUMPS. SUMPS SHALL, BE HYDROSTATICALLY <br /> DETAILS Y � Fi NPIPING ILS. ., <br /> Al 6 7 S ON DWG. TK3-,_2 FOR TANK SIPHON DETAILS. TESTED WITH STANDING WATER FOR A PERIOD OF 2 HOURS T INSURE. THAT THE SUMPS <br /> ..� SET: IJET LS . 11, FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY ACCESSIBLE COMPONENTS � � A, <br /> ARE WATERTIGHT. THE ARCO FIELD ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK 16" TO CALCULATE TCP OF TTNB` EL..EVATION, START WITH 1 MINIMUM DEPTH OF VAPOR <br /> " E _ 1, E � WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE INTENDED SERVICE SI-1AL1� BE RECOVER LIN AT 1- F ' <br /> INSTALLATION CHECK LIST BEFORE CONTRACTOR WILL BE. PAID. RETROFITTED TO THE FU INT TH A � E THE FARTHEST DISPENSER AND SLOPE 1/4qR PER FOOT MAXIMUM TO <br /> rC _ w F ELS O E STOR GE SYSTEM, 1/16 PER FOOT MINIMUM" ADD 12' AT THE: TANK. ADD 13 FOR 3" PIP O " " <br /> 3. TANKS SHALL E UNDERWRITERS LABORATORY APPROVED AS CALLED FOR ON THE (FOR , E) R (FOR 2 <br /> TANK(S) m -- TBI... ETI T" � ADHERED T NIRA W1 B REQUIRED IRE T » �.� „ <br /> 6. S DIMENSIONIS CR CAL AND MUS BE ACJ. � ED O CONTRACTOR WILL E EQU D O „ � FOR A CHANGE. IN PIPING DIRECTION OTHER THAN 9Q OR 45 e SET TANKS��t�.1 SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND .� � .� S N S 6 DEEPER THAN <br /> E S L � G 12, AL,I.. MANHOLES ON ...THE TANK ,SLAB SHALL BE INSTALLED WITH A 1 1 BROWN OF N <� , <br /> REINSTALL_ AT OWN EXPENSE OR WILL BE BAC CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. / CO CRETE A kl � , <br /> � � . HA B m DOUBLE WALL TANKS OF FIBERGLASS REINFORCED PLASTIC FRP AS � ECALCULATED�LATED Aa PRECAUTION, IN NO EVENT SHALL. THE TANK BE BURIED 1...,L�SS THAN. 4 -O <br /> SHALL E (FRP) _ TO PREVENT WATER INTRUSION INTO THE MANHOLE. SEE SECTION A ON DWG. TK3-6. - , „ <br /> _ _ BELOW FINISH RA - _ <br /> F T NK AN PIPIN SE,E SHEET TK4 2 FOR LIQUID PROBE COUPLING DETAIL. PROBE TO BE MOUNTED AT SIDE OF ELS GRADE OR DEEPER THAN 7 q BELOW FINISHED GRADES SEE MANUFACTURERS <br /> .� _. MANUFACTURED PJY XERXES CORE ORATION. INSTALI,AFION O A S D C� THE ARCO FIELD. ENGINEER Wfl�k,, BE REQUIRED T SIGN FF N THIS i U ERS , <br /> �- Q ED O O O H S TEM ON THF. TANK ., �, „ <br /> TANK WHERE PRODUCT PENETRATION INT F' MA AN BELOW LOWEST PENETRATION INSTALLATION RECOMMENDATIONS. ANY VARIATIONS IN SLOPE FROM 1 4 P <br /> SL-1ALk,� BE IN ACCORDANCE WITH SPECIFICATION 136OCk LATEST EDITION AS PROVIDE[) E E DUGO SUM IS DE D .. . E LO E`� INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PAID. � _ /' PER FOOT SHALL.. <br /> 0 �� � BY ARCO PETROLEUM PRODUCTS COMPANY, AND MANUFACTURER'S INSTRUCTIONS, FITTING WITHIN SUMP AREA, BE. REPORTED TO THF' FIELD EaNGINEER, <br /> TANK LEVEL GAUGELo <br /> B (IF INSTALLED) B <br /> til PRODUCT ,r2 ,a TK.; 1 c ,, � <br /> t� �r� c� m <br /> ! 16._1/2a _n. 16 1 2" SUMP MONITORING .� `� W I � ° <br /> _ - y _ _. 4 PIPE PLUG O <br /> 4 �- REF REF . 18 LIQUID PROBE IF GAUGE NOT , ' " <br /> 1- _. 22 (SEE NOTE 7) INSTALLED) ' C <br /> (' 2"° F,G. VENT _ I - _ 1 1 I I <br /> _ __ _ __ <br /> _ � I I� <br /> ( ? _ ._.� _ _. I ," 16 4"X3" VAPOR RECOVERY ADAPTER « <br /> I I CAP IN SPILL CONTAINMENT USA <br /> =L "= 1 NEW 2„, UNCON TANK L.?EVEL. GAUGE I FILL BOX. co <br /> - <br /> _ IF INSTALLED)cn SCR°D BLACK STEEL ( ) <br /> i ,._. ._. 2 4 v _ _ 13 O <br /> . It <br /> c <br /> m Axa ' <br /> 0 coC <br /> __. c as <br /> 60 <br /> 7 _.. _ ALL MANHOLE ACCESS COVERS <br /> C 0 1 TO BELOW GRADE SHALL BE <br /> Uj 1 1 4 FILL ADAPTER C15 .. LIQUID TIGHT AND LOCKABLE <br /> C75 NEW "' UNION AND CAP IN SPELL <br /> � � � � SCR°D BLACK STEEL. <br /> CONTAINMENT FILL BOX <br /> h- A 2°" V,R, FROM ° <br /> �� . <br /> CK2 m1 <br /> HEADER rn B _ -_ <br /> 6" ACCESS PORT TK --1 <br /> BULKHEAD : TKS 1 <br /> 0 z FITTING; \._ 2O <br /> Z 0_ <� LL 21 AQTIVE SIPHON Ir <br /> SLOPE AS SHOWN ON cd <br /> 4A'x :��°4" GALV. REDUCING �__m,___—._ �.m <br /> DETAIL 10 ON DWG, TK3-2 SEE NOTE; # <br /> TEE W1 4„ GALV. PLUG F3A ��6 � `SST AT 6°° MIN. 14 1 <br /> 12 MAX. - 1 f - 4" PVC THREADED ca <br /> CABLE C'>Rlr 1 ✓ 4 16" NOT TO SCALE: 18" <br /> PIPE CAP 4­0 cd <br /> 26° ISD. _.__... _ „ MIN. CROW SEE NOTE 6 -- <br /> C�--I1 CGB 293 TYF' ,__.m _ . (1T P, �TYP1/2�1_1_" OPENINGS 2" ,P <br /> ( TY4 1/�. TO 6 TYP. 12 <br /> A(- <br /> E NOTE X12 AmC. PAVING cc <br /> ^ <br /> a w» . w� . <br /> 44; , , wtl ,. <br /> ^ ry » <br /> cd <br /> a @ ♦ a B ♦. a W w^ V 4. 9 w'°V » A "w � . �...�»�r -......m ..._.. ...... W...... .._.... ­Ai <br /> W..�... ,.��a.,�A,.. „—.. e w ...mm ,.... .m ,.,.,». �++.T.....�................m. <br /> -m W W W _ w W .. P ,,,.....,w_„—; ,.^� �, « e-P"` ;�.� ...ma�" :°�'""" q Q,._._, ..„�,..,... ......,,,. ..._. ,:.,.,m.m . <br /> _mm a <br /> a 4 » F » 8 « 9 a P a 4 » 4 » 9 9 . 4 » 4 ^ <br /> ^ » t R � a � B a :, <br /> w W _..,.., -,.a....m..,. <br /> w W <br /> ......_. I , _ .. AA - - _` _ __. <br /> I 3 MIN. 3/4 CONDUIT � <br /> cd <br /> SEAL OFF mm _ ^ _mr __..._ <br /> (SEE NOTE #13) <br /> 3/4" GOND. mm _ _.. <br /> 02�3 _ SlEAL OFF (TYP.) S GALLON SPILL SLOOP TO SUMP w 3/`4" CONDUIT CONTAINER WITH <br /> SEE NOTE 13 SEE - SEE <br /> 3/4 C� J BOX (SEE' NOTE. 13) IN LINT` DRAIN � NOTE 1 <br /> TO TURBINE NOTE A, <br /> 1 END OF RIGID CONDUIT <br /> 4 BL.A K STE E <br /> P SEAL fi <br /> p y� r ; <br /> F HON lf•INC NOT SI-1O N _ <br /> RISER T P , . < , <br /> E Ty <br /> p.) <br /> a_ a <br /> i E <br /> ppqq <br /> "� " FF <br /> ��'� H I F R 4 AV RISER O <br /> f PSL T I W R C ITY G I_ . S E <br /> S V O LA <br /> E <br /> M � E 4 <br /> I `�_E N TF , <br /> O m~ 1 <br /> 2 <br /> 21 � x L CK STEED J <br /> r _ o <br /> P N P <br /> LA <br /> ME A RA <br /> RI D D W P WRAPPED <br /> I <br /> CAP <br /> NOTES , <br /> E.E. ES <br /> c� <br /> I <br /> R 5 R PIP AF' <br /> I <br /> � E W E <br /> J O <br /> / <br /> B <br /> e <br /> 4 <br /> 3 CC N IT <br /> O U <br /> C1 A 1 <br /> D <br /> T GRADE D E C) , <br /> 4 <br /> 6 , <br /> .. N r 1 , <br /> EE� O � <br /> A» ,. I <br /> ( <br /> E <br /> � O <br /> P N ,. <br /> SEE NOTE 13"x] _ <br /> 2 VENT V"R, PIPING TANKS IF GAUGING <br /> Rq�^9 'p �p [ N 2 <br /> ...., _.,................. _. ...... .. ..,.,. _., TURBINE <br /> p (l 1 p�p�fY9 NT AN pry 1 )p{ �ry^� SUMPS <br /> [^p A ..:. <br /> ..-. .,....,..._..«.... ,...,.. ..... ..-..... .. ............. ...«.......,...». �..-._,....,......,.. ,,..,_.,_.....,....,.... ..,.,. ....... _._...,.... _ ... 1� L71 N r..ie i.I V N t5!6 tl � A.+, t..4m �CA� m7�IY1 P" <br /> �,. H INSTALLED <br /> 2 NOT IN, ALLE <br /> (FURNISHED 8 TANK MA FIELD f�pNl� TO <br /> �W/ PULL STRIN2 BEI_k_ FNP T T K C QLI AFS. SEE DETAI S 1 Ct <br /> c1 _ A <br /> � _10 SES NOTE 13 .�-. f <br /> ADAPTER ER C?N DWG, TK,3-,-1 FOR OURRENT STANDARDS �i 3 <br /> �- I 3 �� 23 14 h <br /> U. " UMP MONITOR - �- <br /> I 18co <br /> �LEIE <br /> �. <br /> UID PROBE ~~r,, , <br /> I <br /> a <br /> OE � <br /> I BALM; FL AT VALVE <br /> I . 1 ° <br /> ' -- \ <br /> --- - BACK FILE--�-- \ �\ <br /> NOTE,. FOR SITES WITH I I PEA GRAVELm <br /> cq MORE THAN 12 FUELING I I CRUSHED ROCK X \ ° <br /> �I I I \ <br /> d ° POSITIONS A SECOND 2 HP I AS PER TANK 0 \ <br /> I PI I <br /> d ,✓ VARIABLE: SPEED TURBINE � MANFW PE.CS. \ \ cc <br /> / <br /> WILL BE INSTALLED IN THE I P I I ( � \ <br /> 1 A / I � SP,) o \ <br /> 1 DAC)QQ GALLON 87 OCTANE I I I I \ <br /> \ \ r <br /> SEE. NOTE 3 <br /> COMPARTMENT AND I I I I � � <br /> MANIFOLDED WITH THIS I P I I I I �� <br /> / TURBINE I III I <br /> ,� ! <br /> 0 Cc <br /> Ll C) 0 < c: 0 <br /> 5 7 8 9 1. 0 111 12 1 zt 1 1 � � <br /> I C I I I I 16 1 <br /> L i I I I I I <br /> I II I <br /> 0 0 <br /> z LL <br /> co <br /> _ z W <br /> < o 0 <br /> 0 co <br /> �Z ,o c: <br /> II I <br /> 0 <br /> o e I I I Z 0, 0LAJ <br /> ANNULAR SPACE III I / J <br /> TANK LEAK I P I I I <br /> I <br /> I <br /> /� <br /> � \ \\ DETECTOR <br /> �,� <br /> \ \\y (LIQUID _, <br /> \ OHA <br /> \ Sti E E NOTE 1 --�-2" BLACK STEEL <br /> \ I SIPHON PIPE " <br /> ( 1/4" STEEL PROTECTION <br /> \ I PLATE- TYP ALL 4? . <br /> P OPENINGS ON ✓ ° <br /> FIBERGLASS TANK <br /> CL <br /> E No <br /> IWO <br /> » » "a IN +SPtC " , <br /> a 8 <br /> e ,a <br /> TANK SHALL BE SET DEAD LEVEL ;.m„& �„” PEA GRAVEL/ „I 18215 72ND AVENUE SOUTH <br /> ^^ » CRUSHED KEN , W HI GTO 9 f�32 <br /> "^ OR SLOPED 1 MAX. TO ANNULAR' SPACE PROBE <*"W ,W. „. ^WWaW ROCK LIED (206) 2�1-6222 <br /> _._ <br /> � ' 2"-Q MIN, TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER END OF TANK - 2`- O" MIN, N.T.S, <br /> date,N.Tm.S. <br /> EXCAVATION ONLY <br /> EXCAVATION <br /> ONLY PRODUCTS REVOONS <br /> f sNO. ARCO <br /> THIS DESIGN ARRANGEMENT IS TYPICAL FOR DOUBLE WALL FIBERGLAS ........ ....... .... ..n. ... ____. _.. <br /> TANKS. SEE SITE PIPING PIAN AND MATERIALS LIST ON DRAWING A Eexe. y <br /> TK4--3 FOR ACTUAL MANUFACTURER'S CHOSEN FOR THIS PROJECT ,T/27 /9',) .7 V, <br /> PEFUT <br /> c <br /> Underground Tank Section <br /> z A B9) 2186 <br /> NOT TO SCALE: l <br /> SFE NOTE 3 T. oh"tfie <br /> AS-OMTTK2-lB <br /> A Of <br /> AR924\92321 B.DWO <br /> File„ 2023 .21 E <br />