My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 2:09:22 PM
Creation date
3/26/2019 10:53:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE WORK HEALTH AND SAFETY PLAN <br /> 1. GENERAL <br /> This Health and Safety Plan has been designed to conform to and/or exceed guidance standards <br /> promulgated by EPA and the California Department of Health Services, Federal OSHA regulations <br /> (29CFR1910.120) and CAL/OSHA regulations. Because considerable experienced judgment must <br /> be applied to decisions that will be made while actually working on site, it is the goal of this plan to <br /> provide maximum work efficiency while maintaining an uncompromisingly safe working environment. <br /> This plan is not a substitute for experienced judgment and direction,or for common sense during <br /> construction activities. <br /> Henderson Construction will provide services and equipment for the completion of the scope <br /> of work. Henderson Construction (as well as all subcontractors and independent contractors)will <br /> adhere to the Site Work Health and Safety Plan. <br /> 2. WORK OBJECTIVE <br /> The overall work objective is to provide for proper and safe completion of scope of work. <br /> 3. SAFETY MANAGMENT <br /> The field supervisor, is the site and safety officer and will <br /> ensure that all personnel comply with all applicable regulations and requirements of this plan. Due <br /> to the various aspects of the work, specific personnel are not assigned to this project at present. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.