Laserfiche WebLink
r <br /> 8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> M <br /> b. Tank/Piping Hauler. <br /> Name_E� F\ <br /> Address-? city zip Q U <br /> Phone No{ <br /> Hauler Registration#(11 hauled as hazardous) 1 �, <br /> C. Tank0ping Disposal Site: <br /> Name L \ <br /> Address 2.5 `� �Z� "� LU� City \C r\�ll N� zip 8 U <br /> Phone No 5.( <br /> EPA M#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YE�( NO[] <br /> 9a. Describe,in detail,how the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> r � 1 P'—\ � �\\ i A-k 1A L N� <br /> 7 \�\ '_�, <br /> 10. Describe how the excavation will be backfilled with suitable material upon removaL <br /> 1 N,i- )'Z k Int\ v —7 v4 C L �N f� ���� A J 'L <br /> 11. Handling of excavated soil• <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> V ! <br /> b)What will be the final destination of the excavated stockpile? <br /> F_ L_- � <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name '� \. Hauler Registration# <br /> Address1� \{�'�L�l� city. Zip U t <br /> Phone No.( <br /> EH 23 046(Revised 10119198) Page 5 <br />