Laserfiche WebLink
I) All moblls equipment must be equipped with seas pelts which roue:be worn by <br /> the operator at all times. <br /> g) ASI job site vshloles will be equipped with a eervlaa brake,perking brake and <br /> emergency broke system. <br /> 0, in the event of open excavations,which Is a hazard to on-site workers, <br /> the following policy regarding excavations will be followed. <br /> a) Entry into excavations greater than 4 feet deep Is prohlblted,unless the <br /> requirements of TO CCR 1 541 are met, <br /> b) Hazards associated with general construction may occur during the course of <br /> conetruabom ParsonrNl should be alert and proven as well as$Vold these <br /> hazards, <br /> o) When tank removal Is part of scope of work,there is a signftant pctentlel for <br /> hazards from falling loads when Ilfting and removing banks, Workers must be <br /> especially alert to this hazard. <br /> C. During general construction acts ties,there is also a potential for general <br /> (construction type) safety hazards. This plan does not address general safety in <br /> detail.If personnel are frequently reminded and will cooperate In being <br /> courteous,careful, alert, and thoughtful of outlines safety procedures, and if <br /> they use common sense In actions and in coneldoring probable consequences, <br /> much will already nave been accomplished to insure a safe working environment <br /> 4 <br />