Laserfiche WebLink
Sequoia 819 Striker Avenue,Suite 8 <br /> Sacramento,CA 95834 <br /> Analytical (916) 921-9600 <br /> FAX(916)92 1-0100 <br /> F <br /> Cameron ParkProject: ARCO2186,Stockton Sampled: 6/24/99 to 6/25/99 <br /> mbridge Road,Ste.202 Project Number: N/A Park,CA 95682 Project Manager: Mark Capps Received: 6/25/99 <br /> Reported: 7/11/99 <br /> Total Metals by,EPA 6000/7000 Series Methods/Quality.Control <br /> Sequoia Analytical-Sada nento <br /> Date Spike Sample QC <br /> Analyte Reporting Limit Recov. RPD RPD <br /> Analyzed Level Result Result Units Recov. Limits % Limit % Notes* <br /> Batch: 9070063 Date Prepared- 7/6/99 <br /> Bunk PExtraction Method: EPA 305013 <br /> 9070063-BLK1 <br /> Lead 7/8/99 <br /> ND mg/kg 2.50 <br /> LCS 9070063-BSI <br /> Lead 7/8/99 50.0 <br /> 43.3 mg/kg 80.0-120 86.6 <br /> Matrix SpiU 9070063-MSI 5906401-06 <br /> Lead 7/8/99 50.0 ND <br /> 43.9 mg/kg 80.0-120 87.8 D <br /> Matrix Spik Duo 9070063-M D1 8906401-06 <br /> Lead 7/8/99 50.0 ND <br /> 43.8 mg/kg 80.0-120 87.6 20.0 0.228 D <br /> Sequoia Analytical-Sacramento <br /> *Refer to end of report for text of notes and definitions. <br /> Page 13 of 16 <br />