Laserfiche WebLink
2186: 3212 N CALIFORNIA, r' `;KTON, CA 95204 Dater stir ervic' 10/12r2005 <br />- - ---ice -$— <br />F. In -Tank Gauging/ SIR Equipment: Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is Inst. alled. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the fallawing checklist: <br />* Ix the Section H, below, describe how axd when these deficiencies were or will be correcte d. <br />G. Line Leak Detectors (LLD): M' Check this box ifLLDs are not installed. <br />Complete the followine checklist: <br />hy Yes <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings tested? <br />UYes <br />No* <br />Was accuracy of system water level readings tested? <br />Yes <br />No*Were <br />all probes reinstalled properly? <br />Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* Ix the Section H, below, describe how axd when these deficiencies were or will be correcte d. <br />G. Line Leak Detectors (LLD): M' Check this box ifLLDs are not installed. <br />Complete the followine checklist: <br />hy Yes <br />No* <br />For equipment start -tip of annual equipment certification, was a leak simulated to verify LLD performance? <br />NIA <br />(Check all that apply) Simulated leak rate: .3 g.p h.l; 0.1 g.p.h.2; S 0.2 g.p.h.2 <br />Notes: 1. Required for equipment startup celti cation 9t1d annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />M11N o* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />NIA <br />Yes <br />No* <br />For electronic L.LDs, does the turbine automatically shut off if the LLD detects a leak? <br />NIA <br />Yes <br />No* <br />For electronic LLD9, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />NIA <br />or disconnected? <br />Yes <br />No* <br />For electronic LLD s, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />NIA <br />or fails a test? <br />Yes <br />No* <br />For electronic LLDs, have all accessible wiring connections beer. visually inspected? <br />NIA <br />Yes <br />No* <br />Were allitems onthe equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe kow and whex these deficiencies were or wiu de corrected. <br />H. Comments: <br />Page 3 of 3 03.01 <br />