My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page Z of L <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: DIAL GAUGE <br />Equipment Resolution: 0 to 15" psi <br />Piping Run # c(1 Piping Run # <br />Piping Run # Piping Run # <br />Piping Material: <br />Fiberglass Fiberglass <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />Piping Diameter: <br />3 `` <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />-lie Si- 60u t <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Minutes 15 Minutes <br />15 Minutes 15 Minutes <br />Test Start Time: <br />, S <br />Initial Reading (Rj): <br />5 PSI 5 PSI <br />5 PSI 5 PSI <br />Test End Time: <br />i5 - <br />SFinal <br />Final Reading (RF): <br />PSI PSI <br />PSI PSI <br />Test Duration: <br />1 Hour 1 Hour <br />1 Hour 1 Hour <br />Change in Reading (RF -RI): <br />-49rl— PSI PSI <br />PSI PSI <br />Pass/Fail Threshold or <br />Criteria <br />Zero Zero <br />Zero Zero <br />} <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />QeQ I �c I- o° c ic^ S 1-e i <br />BP/Arco #02186 <br />3212 N. California <br />Stockton, CA. 95204 <br />N04731R — SB 989 Repairs <br />
The URL can be used to link to this page
Your browser does not support the video tag.