Laserfiche WebLink
WAYNE PERRY, INC. <br />Environmental Remediation, Construction and Consulting <br />October 14, 2004 <br />Certified Unified Program Agency <br />County of San Joaquin <br />Mr. John Jackson <br />304 East Weber Avenue, 3 d Floor <br />Stockton, CA 95202 <br />RE: B P / ARCO <br />3212 N California St. <br />Stockton Ca. 95204 <br />Dear John, <br />0 <br />Per our telephone conversation here is the information that you requested for the above <br />mentioned site. <br />Mi . • <br />Breakout concrete just outside of tank zone, remove backfill to expose secondary line on <br />the 91 product and helium test to find the leak. The proposed parts will be A/O SMITH <br />FIBERGLASS secondary clamshell fittings. Once repaired, the secondary line will be <br />retested w nitrogen to comply with SB989 testing parameters. Wayne Perry will notify <br />the correct agency involved 48 hrs before the retest. Wayne Perry will backfill with <br />pressure on the secondary line to insure that there is no damage to the said product <br />piping. Re -pour concrete to match existing. <br />If you have any questions, please give me a call at (916) 646-9680. Thank you for your <br />time cooperation. P <br />Ck+ �Iw" a lib-r-fte . <br />Sincerely, <br />Jason Audiss <br />Project Manager <br />Wayne Perry, Inc. <br />30 Main Avenue, Suite 5 Sacramento, California 95838 Phone (916) 646-9680 (800) 883-0352 Fax (916) 646-9683 <br />