Laserfiche WebLink
SWRCB, January 2002 <br />/0—/6-0-7 2 4. SPILL/OVERFILL CONTAINMENT BO <br />Page of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer 215dustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: `/ &x Equipment Resolution: <br />Spill Box # SPHI Box # 8-7 <br />Spill Box # <br />Spill Boa # <br />Bucket Diameter: <br />/Z— <br />LBucket <br />BucketDepth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />2 <br />{ <br />pa/1' Gc <br />Test Start Time: <br />Q ' S <br />/O s- <br />Initial Reading (R,): <br />3/ <br />Test End Time: <br />Final Reading (RF): <br />53l <br />S-4/ S' t/4 <br />Test Duration: <br />Change in Reading (RF -R,): <br />(� <br />O <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Z.Aass ❑ Fail <br />Pass ❑ Fail <br />Pass ❑ Fail <br />Cl Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />