My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />FRED FIEDLE <br />1390 Willow Pass Rd., Suite <br />Telephone: 925/691-4444 Fax <br />DCA -(08740) <br />San Joaquin County <br />Environmental Health <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Attn: John Jackson <br />R AND ASSOCIATES <br />605, Concord, California 94520-7906 <br />: 925/691-4441 E -Mail: FFA@FFA.com <br />October 16, 2003 <br />Subject: ARCO #2186, <br />3212 North California St. <br />Stockton, CA <br />RE:. ' <br />Mr. Jackson, <br />Per your request, here is the scope of work for the above mentioned project: <br />1. Contractor to saw cut 6' x 6' minimum sections of existing tank slab at each manhole as shown. <br />2. Contractor to remove existing fill spill buckets. Remove existing drop tube flapper valve (if any) <br />and any non-EVR ball floats. <br />3. Contractor to install new EV* r adapters. <br />4. Contractor to install ne 5 gallon spil containmen_ t _buckets and manhole w/frame at each tank <br />fill. EVR VR -102-B complian . i <br />5. Contractor to insta new fill drop tube and ball floats at each t EVR VR -102-B compliant. <br />6. Contractor to install new riser components at existing tank gauge risers. Field verify exact riser <br />location. EVR VR- 102-B compliant. <br />7. Contractor to install new pressure vacuum vent valve as needed, at each gasoline vent riser. EVR <br />VR -102-B compliant. <br />$_—.�,on_tractor to patch all removed concrete to match existing. <br />9. Install new ee er- oot over i alarm w acknowledgement switch and new automatic tank <br />if not existing. <br />Based on our prior conversation, once you receive this information, permits should be issued within 1-2 <br />business days. If you have any questions, or needad .tional information please do not hesitate to contact <br />me at (213) 448-3912 _ C11 <br />DCA <br />Very Truly Yours, <br />Daniel C. Auten, II <br />
The URL can be used to link to this page
Your browser does not support the video tag.