Laserfiche WebLink
Dec 11 02 05:49p T _T Environmental System t' it 858-1011 p.8 <br />Site Address: SS #2186, 3212 N. California, Stockton Date of Testing/Servicing: t✓ <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventoty control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com lete the following cltecKutst: <br />El ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No <br />11 tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracyo oduct level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water lever tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist comp <br />*in the Section H, below, aescrine now auu wucu LIM— uc..............1 .. �• �- • • - - -_ ___ _ _ _ _ _ <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed. <br />* In the Section H, below, describe now ana when tuebe ueu AVKI"w "VAC — ....• •-- <br />H. Comments: <br />Page 3 of 3 <br />0310) <br />