My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 11 02 05:49p T _T Environmental System t' it 858-1011 p.8 <br />Site Address: SS #2186, 3212 N. California, Stockton Date of Testing/Servicing: t✓ <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventoty control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com lete the following cltecKutst: <br />El ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No <br />11 tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracyo oduct level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water lever tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist comp <br />*in the Section H, below, aescrine now auu wucu LIM— uc..............1 .. �• �- • • - - -_ ___ _ _ _ _ _ <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed. <br />* In the Section H, below, describe now ana when tuebe ueu AVKI"w "VAC — ....• •-- <br />H. Comments: <br />Page 3 of 3 <br />0310) <br />
The URL can be used to link to this page
Your browser does not support the video tag.