My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/12/2000 15:27 7146705^?0 <br />'A` <br />`ARCO <br />Station # <br />Address . <br />Company <br />HSE DEPT <br />PAGE 03 <br />Mechanical Leak Detector Test Data Sheet <br />Date I i � Q 196)2 <br />Test Information <br />Replaced All Failed Leak De ors Yes__ No N/A <br />If No, Replacement To Be Com pleted By (Date) <br />This letter certifies that the tnual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor <br />Technician Lic# <br />Signature <br />APC•3326 (SM) <br />I <br />2 <br />3 <br />4 <br />5 <br />Product <br />r),'w <br />t <br />S - <br />Manufacturer <br />i M <br />Model <br />Full Operating Pressure (psi) <br />! <br />�. <br />Line Bleed Back (ml) <br />Trip Time (sec) <br />Metering Pressure (psi) <br />F/E Holding Pressure (psi) <br />Test Leak Rate (ml/min) (gph�� 11 <br />PASS or FAIL <br />Replaced All Failed Leak De ors Yes__ No N/A <br />If No, Replacement To Be Com pleted By (Date) <br />This letter certifies that the tnual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor <br />Technician Lic# <br />Signature <br />APC•3326 (SM) <br />
The URL can be used to link to this page
Your browser does not support the video tag.