My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PRESCOTT
>
13771
>
2800 - Aboveground Petroleum Storage Program
>
PR0515663
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:51:29 AM
Creation date
3/26/2019 3:46:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515663
PE
2832
FACILITY_ID
FA0010178
FACILITY_NAME
Wilbur-Ellis Company LLC: Manteca
STREET_NUMBER
13771
STREET_NAME
PRESCOTT
STREET_TYPE
Rd
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
13771 Prescott Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N Q U IN Environmental Health Department <br /> -F0jN .� Y <br /> Aboveground Petroleum Storage Ac# [nspectron Report <br /> Facility Name: Facility Phone: Data: <br /> Wilbur-Ellis Company LLC: Manteca (209)982-5400 March 11, 2019 <br /> Facility Address: CERS 113; <br /> 13771 Prescott Rd, Manteca, CA 95336 10157651 <br /> Inspection Contact: Title: Phone: <br /> Damon Gordon Operations Manager (209)982-5400 <br /> inspection Type: 72832-ASTFAC <br /> rogram: <br /> ROUTINE INSPECTION-Operating Permit 10 K/=100</=100 K GAL CUMULATIVE <br /> Consent For: Consent Given By: <br /> Z Ins ection Z Photos ❑ Sam les I Damon Gordon, Operations Manager <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R w Repeal violation COS=Corrected on site during inspection <br /> Abovegrotirtd Petroleum Storage"Act <br /> 101 HSC 25270.6(b) Failed to pay APSA program annual fees a V a R o COS <br /> 102 HSC 25270.4.5(a) Failed to prepare a written SPCC Plan in accordance with CFR Part 112 a V u R in COS <br /> 103 HSC 25270.6(a) Failed to file HMBP or annual facility tank statement o V ❑R o COS <br /> 104 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more ❑V ri R o COS <br /> 105 CFR 112.1(b)(3),112.2 Failure to properly close tanks when making a claim of permanently closed n V o R n COS <br /> 106 HSC 25404.1.2 Failed to submit a certification and written response within 30 days for minor violations ❑V in R n COS <br /> 107 HSC 25270.2(a)(4) Failure to prepare SPCC plan when facility no longer meets oil-filled electrical equipment exclusions n V n R a COS <br /> 108 HSC 25270.4.5(a) Failure of conditionally exempt facility to conduct inspections or install secondary containment n V o R n COS <br /> 109 HSC 25270.2(o)(1)(C) Failure to have secondary containment and/or leak detection if TIUGA piping cannot be viewed n V ra R n COS <br /> (iv)(111) <br /> 110 HSC 25404(e)(4) Failed to report program data in the California Environmental Reporting System(CERS) n V n R o COS <br /> Ria ulrement to Prepare and Implement a":SPCC Plan <br /> 9 <br /> 201 CFR 112,3(d) Failure to have a licensed PE properly review and certify the SPCC plan in V n R a COS <br /> 202 CFR 112,3(e)(1) Failed to maintain a copy of the Plan on site t3 V n R n COS <br /> 203 GFR 112,3 Failure to implement the SPCC Pian n V n R o COS <br /> 204 CFR 112.3(g) Failure to prepare SPCC Plan when facility no longer meets Qualified Facility criteria o V n R o COS <br /> 205 CFR 112.3,112.6 Failure to prepare SPCC Pian that meets all applicable requirements o V n R n COS <br /> 206 CFR 112.3(d)(1) Failure of owner to assure that the PE makes alt required attestations in the Plan a V n R n COS <br /> Amendment of SP,CG Plan by OWners or bverators <br /> 30111CFR 112.5(a) Failed to amend Plan as necessary ■V a R o COS <br /> 302 CFR 112.5(b) Failed to review Pian once every five years and/or implement any resulting amendments o V n R o COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments n V o R o COS <br /> 304 CFR 112.5(a),112.5(b) Failure to implement SPCC plan amendments within 6 months n V ❑R o COS <br /> Qtialifled Facility-.Tier f . <br /> 401 CFR 112.6(.),112.6(b) Tier 1 Qualified Facility Plan not certified by the owner or a PE n V n R n COS <br /> 402 CFR 112.6(a)(2) Owner of Tier I Qualified Facility failed to self certify technical amendment n V n R n COS <br /> 403 CFR 112.6(a)(3)(i) Plan failed to predict direction/rate of flow/total quantity of oil potentially discharged a V n R ❑COS <br /> 404 CFR 112.6(a)(3)(ii) No 2CT for bulk containers,or mobile storage containers not located to prevent discharge n V n R n COS <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided,not described in Plan,or tested ❑V n R n COS <br /> FA0010178 PR0515683 SC001 03111/2019 <br /> EHD 28-01 Rev.0912712018 Page 1 of 5 Aboveground Petroleum Storage Act 01R <br /> 1868 E. Hazelton Avenue I Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.