My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PRESCOTT
>
13771
>
2800 - Aboveground Petroleum Storage Program
>
PR0515663
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:51:29 AM
Creation date
3/26/2019 3:46:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515663
PE
2832
FACILITY_ID
FA0010178
FACILITY_NAME
Wilbur-Ellis Company LLC: Manteca
STREET_NUMBER
13771
STREET_NAME
PRESCOTT
STREET_TYPE
Rd
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
13771 Prescott Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILBUR-ELLIS° <br /> SPCC PLAN BRANCH SPECIFIC INFORMATION <br /> Manteca, CA <br /> Facility Information <br /> Branch Name Manteca <br /> Location ID 471900 <br /> Aerial Location No <br /> Business Region&Area Western North San Joaquin Valley <br /> Branch Phone Number (209) 982-5400 <br /> Physical Address 13771 S. Prescott Road <br /> City,State,Zip Manteca, CA, 95336 <br /> County San Joaquin <br /> Latitude 37.83922667 <br /> Longitude -121.1685782 <br /> Mailing Address PO Box 2216 <br /> Mailing City, State,Zip Manteca, CA, 95336 <br /> SIC/ NAICS Code 5191 424910 <br /> Dun & Bradstreet 006913479 <br /> Number of Employees 45 <br /> Location & Facility Layout <br /> The aerial &topographic images on page 2 show the location of the facility. The site map attached at the end of <br /> this Plan shows the facility layout including the location of storage tanks, secondary containment structures, <br /> subsurface drains, and surface water runoff direction. <br /> Operations&Security Measures <br /> The main operation at the facility is wholesale agrichemical distribution. The primary industrial activities at the <br /> facility include fertilizer storage&distribution, pesticide storage and distribution. A perimeter fence and security <br /> lights are present at the site. <br /> Proximity to Navigable Water Ways <br /> Nearest water way: unnamed channel draining into Stanislaus River <br /> Distance to nearest water way: 525 feet south <br /> Direction of drainage flow from site: east <br /> Discharge History <br /> No oil spills have occurred over the past 3 years. The facility has not discharged more than 1,000 U.S. gallons of <br /> oil in a single reportable discharge or more than 42 U.S. gallons in each of two reportable discharges in any <br /> 12-month period. <br /> Substantial Harm Criteria <br /> There is no applicability of substantial harm in any criteria as per 40 CFR Appendix C to Part 112, see Appendix B <br /> of the Wilbur-Ellis Company SPCC Plan Policy. <br /> Page 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.