Laserfiche WebLink
WILBUR-ELLIS° <br /> SPCC PLAN BRANCH SPECIFIC INFORMATION <br /> Manteca, CA <br /> Regulatory Requirement: <br /> This Facility will follow the general secondary containment requirement measures detailed in the "Spill <br /> Prevention, Control, and Countermeasure (SPCC) Rule Final Amendments for Oil Production Facilities" dated <br /> December 5, 2008 and documented in the Federal Register as 73 FR 74236. <br /> Amendments: <br /> REVISION DATE REASON FOR REVISION SIGNATURE <br /> 06/07/2019 Revision includes the addition of 7 oil or fuel tanks �j nn <br /> and the correction of the TI-3386 volume '(Q�.l.O,i•�, Qjo <br /> In accordance with 40 CFR 112.5(b),WECO will review this SPCC Plan at least once every five years,or when there <br /> is any change in the facility design, construction, operation, or maintenance that materially affects the facility's <br /> potential for an oil discharge. Revisions to the plan, if needed, will be made within six months of the five year <br /> review or facility change. A registered Professional Engineer will certify any technical amendment to the Plan, <br /> and record them above, in accordance with 40 CFR 112.3(d). <br /> Page 13 of 14 <br />