My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PRESCOTT
>
13771
>
2800 - Aboveground Petroleum Storage Program
>
PR0515663
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:51:29 AM
Creation date
3/26/2019 3:46:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515663
PE
2832
FACILITY_ID
FA0010178
FACILITY_NAME
Wilbur-Ellis Company LLC: Manteca
STREET_NUMBER
13771
STREET_NAME
PRESCOTT
STREET_TYPE
Rd
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
13771 Prescott Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILBUR-ELLIS° <br /> SPCC PLAN BRANCH SPECIFIC INFORMATION <br /> Manteca, CA <br /> Regulatory Requirement: <br /> This Facility will follow the general secondary containment requirement measures detailed in the "Spill <br /> Prevention, Control, and Countermeasure (SPCC) Rule Final Amendments for Oil Production Facilities" dated <br /> December 5, 2008 and documented in the Federal Register as 73 FR 74236. <br /> Amendments: <br /> REVISION DATE REASON FOR REVISION SIGNATURE <br /> 06/07/2019 Revision includes the addition of 7 oil or fuel tanks �j nn <br /> and the correction of the TI-3386 volume '(Q�.l.O,i•�, Qjo <br /> In accordance with 40 CFR 112.5(b),WECO will review this SPCC Plan at least once every five years,or when there <br /> is any change in the facility design, construction, operation, or maintenance that materially affects the facility's <br /> potential for an oil discharge. Revisions to the plan, if needed, will be made within six months of the five year <br /> review or facility change. A registered Professional Engineer will certify any technical amendment to the Plan, <br /> and record them above, in accordance with 40 CFR 112.3(d). <br /> Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.