Laserfiche WebLink
AS d <br /> Tm�k m#m C no iva Typead Ma[aial Contents Tgeityoted o MaufiaWe/ CaNaim Lara[im SxadaY CaNamnm[ <br /> equpn�mt# (APaeitY(gallma) ImtallaHm Dezryk�m <br /> Single-walled Sleet One. Charm Rykm Oil 1.3 dwm@55 <br /> AW ISO 68 ca=55-165 <br /> Smgl—lboi Steel Uwn Shell Od IM 1.3 Awns @ 55 <br /> NIA 1-3Awm@55 NIA MNNenanu Nen <br /> Smgl—Ited SteelUwn WD M LJnicm[ ea_55-t65 <br /> Smgl—Ited SteelUwn HggemNmaw..OJa 1.3 Awm@55 Upon—wietimoftlie <br /> -55-165 m ends ima—ldedn <br /> Smgl—Ited SteelUwn RYsek BO-2203 148 dorms@55 Pim NttMmN 3xtim 30 <br /> Blaek en-55-990 Ne Beed emmuwm will have <br /> s gl—Itel Steel awn Ryvek 301 Blue 148 drama@55 s¢el semday CONainma�t <br /> ea-55-990 Pe§1128(e)(2) <br /> NIA 3mti—IlW Steel Uwn Ryu ,IWRM 148 drama@55N/A Mold Nen To <br /> ea=55-990 Shmnge <br /> Singl—Iteds.elUwn Ryvek 5150 148 drone@55 <br /> ea-55-9311 <br /> S.,Ie mited Steel Uwn Ryvek 809 Peple 148 donne@55 <br /> ®-55-990 <br /> Subtotal:Balkma <br /> Stga Containers ,356 S to <br /> Sg356 el- <br /> �RBIEBEI.Rc1R[cay OFERAT[OF'AL&MnmmAcnmwcE [Bn¢m <br /> Meld Presses ASTm�Im,Single-walletl Steel HYtlran1.Cil 2@225®-050 Felnuary 2004 M.N. <br /> Chinon, Re"onla',Smgle-walled Steel LCie—at Seemdmy <br /> ub�iaMing Oil 95 Felxuary 2004 <br /> H i encu[ AST Cmtaimnent meeting Ne <br /> Gintling Rxtagula,3mglewallel3[eel GMNng Men rcquumeNsaf <br /> H Ul mev[ AST LubnvatingOil 3®58®-194 Peb�mry 2001 §1127(e)(1)(—,) <br /> HYAavlie Reetawula,3mglewelled 3[al HYAavlie Oil 485 February 2001 Main SMI<hgex <br /> Pwaa Unit AST Rmm <br /> Subtotal:Oil-filed Operational PgNpment L,2N gallons <br /> FACDATy TOT CtmtlTOR,efag PAQTY 45,565 in <br /> 51,560,11. IN <br /> Nota_Two electrical transformers are located at the south side of the facility, see Figure 2. This oil-filled electrical aqui,.w is undo the jurisdiefi.and <br /> opemtonel control ofthepublicutility cmnpmry PG& andtmrefine is not included inthe SPCC inventory ofmgdatedAMAmmonabove.Ho.g dug101he <br /> potential for a discharge filo.this equipment,the PG Etmnsflnuers are included in the monthly inspection checklias.Arty obxrved mrseepeeled release f. <br /> tus equipment should be immediately reported to the utility eoinpar,e',see a tnael infamatim m Appendix D. <br />