Laserfiche WebLink
C0HAV <br /> CIVIL ENGINEERING,LAND PLANNING,SURVEYING,ENVIRONMENTAL SERVICES <br /> c` August 27, 2008 <br /> u STANDARD FEDERAL EXPRESS <br /> 0 ? (209)468-3420 <br /> s �y- <br /> G)r- <br /> Lr�Ec �� � <br /> Linda Trickett LJ <br /> �I% <br /> San Joaquin County <br /> Environmental Health Department AUG 2 ZGG8 <br /> 600 East Main Street ENV1R0 <br /> Stockton CA 95202 �tiP41Eru7 HEALTH <br /> PERrut!T/St-RVICES <br /> RE: UST Retrofit Permit Application <br /> EVR Phase Il Upgrade <br /> ARCO Retail Fueling Facility <br /> 3212 N. California, Stockton, California 95202 <br /> BP Fac.No. 2186/Our Job No. 13438 <br /> Dear Linda: <br /> On behalf of our client, BP West Coast Products LLC, Barghausen Consulting Engineers, Inc. <br /> respectfully requests that the San Joaquin County Environmental Health Department review and approve <br /> the Underground Storage Tank Retrofit permit application for the EVR Phase II equipment upgrade to be <br /> completed at the existing ARCO fueling facility referenced above. <br /> Please note that the installation of the Healy Clean Air Separator (CAS) is mandated by the State of <br /> California Air Resources Board (CARB) and the San Joaquin Valley Air Pollution Control District <br /> (SJVAPCD). The CARB and the SJVAPCD require that this equipment be installed and operational by <br /> 2009. BP is submitting this application at this time to ensure that there is plenty of time to complete the <br /> installation prior to the CARE-imposed deadline. <br /> Enclosed for your review and approval are the following: <br /> 1. Two(2)copies of the signed UST Retrofit Permit Application <br /> 2. Two(2)sets of wet-signed plans <br /> 3. One (1) Barghausen Consulting Engineers, Inc. check in the amount of$294, made payable <br /> to San Joaquin County Environmental Health Department for the plan check review fees <br /> The scope of work is as follows: <br /> • Retrofit existing dispensers with new EVR Phase R equipment per CARB Exec. Order VR- <br /> 202-F <br /> • Install one(1)new Veeder-Root ISD pressure sensor at dispenser nearest the tanks <br /> • Install one(1)new Veeder-Root ISD vapor flow meter at each dispenser <br /> • Install the Clean Air Separator(CAS) on concrete pad <br /> • Manifold existing gasoline vent risers and connect 1-inch vent line from Healy tank to vent <br /> stack manifold <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES * OLYMPIA,WA # TACOMA,WA * SACRAMENTO,CA 4 TEMECULA,CA <br /> www.barghausen.com <br />