My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 4:54:02 PM
Creation date
3/27/2019 1:36:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH AND SAFETY PLAN <br />PART <br />GENERAL SITE I FORMAT O/N <br />1. Site Name: s -&W. <br />6PPL ( a <br />Address: 132'a N • &W. 14 • <br />Contact Person: <<2yirJ Ve Phone No: 9ef(-'A6g`I <br />Sweeps Number: <br />Proposed Date of investigation/inspection: <br />PA <br />3. <br />Description and brief narrative of inspection activity: <br />❑ New UST installation. <br />❑ UAR Investigation. <br />❑ Tank Closure in Place. <br />❑ Tank/Pipe Repair. <br />❑ Tank/Pipe Removal. <br />❑ Re -excavation. <br />❑ Installation of Borings / <br />Monitoring Wells. <br />Sp `i iSic <br />Specifics Site Inffoor tion: <br />Mc, <br />Tank No.: <br />Tank Capacity: _ <br />Tank Content: <br />Tank Age: <br />Other: <br />4. Type of Operation: � -114 & 1c r#i <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES ❑ NO <br />Documented Groundwater contamination: ❑ YES ❑ NO <br />Background and description of any previous investigation or incidence: <br />6. Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />] Heator Cold Stress: 'F (high ambient temp.) <br />Noise Sources: N YA Rw <br />❑ Oxygen Deficiency: UU <br />❑ Excavation: (falls, trips, slipping, cave-ins): <br />❑ Handling and Transfer of a Hazardous Substance: (fire, explosions, <br />etc..): <br />❑ Confined space entry: (explosions): <br />❑ Heavy equipment (physical injury & trauma resulting from moving <br />equipment): <br />❑ Other, specify <br />7. Anticipated Biological Hazards: <br />❑ Snakes ❑ Insects ❑ Rodents ❑ Poisonous Plants <br />❑ Other/Unknown (specify): <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.) <br />EH 23081 (12/17/2002) <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Chemicals Hazards <br />Carcinogens: <br />❑ Corrosives: <br />[ Dusts: <br />❑ Explosives: <br />Flammables: <br />❑ Inorganic Gases: <br />❑ Metals: <br />❑ Oxidizers: <br />❑ PCB's: <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />1. Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B <br />® Hard Hat. <br />aSafety Glasses/goggles. <br />[3'Steel toed/shank shoes or boots. <br />❑ Flame retardant coveralls. <br />® Hearing protection. <br />❑ Tyvek. <br />0 0 <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: <br />Safety vest. <br />❑ Two-way communication. <br />PART IV - PLAN APPROVAL <br />Plan Prepared by: , - (f 1 Date: &-13 08 <br />Plan Approved by: <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.