Laserfiche WebLink
FIED PROGRAM CONSOLIDATED FO <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 3) <br />TYPE OF ACTION ® 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION 490-1. <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />T] <br />1• <br />BUSINESS NAME (Same as Facility Name or DBA) 3. <br />ARCO 02186 <br />BUSINESS SITE ADDRESS 3212 N CALIFORNIA 103.BUSINESS <br />SITE CITY STOCKTON 104, <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must beyerformed by qualified personnel. [23 CCR §2632, 2634, z63a, 2641] <br />490-3a. <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): 490_3n <br />III. MONITORING LOCATIONS <br />® I. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632,2634] 490-4. <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) har a k l <br />® 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. [23 CCR J2632,2634] <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-6. <br />PANEL MANUFACTURER: Veeder Root 490-7. MODEL #: TLS-350 490-8. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL #(s): 794390-409 490-10. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). [23 CCR §26431 490-11. <br />PANEL MANUFACTURER: 490-12. MODEL # 490-13. <br />IN-TANK PROBE MANUFACTURER: 490-14. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490-17. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. d c. OTHERago-ls. <br />g•P• g•P• (Specify): 490-19. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 CCR §2646.1] 490-20. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §2645] TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS 494§6-2". 21 <br />❑ 5. TANK INTEGRITY TESTING PER [23 CCR §2643.1] 490-23. <br />TEST FRE UENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHERS eci 49424. <br />Q (P fY)� a90-zs. <br />_-26. <br />El99.OTHER (Specify): 490-26.6. <br />ago-27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hat a k all <br />® 1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-28. <br />[23 CCR SECONDARY CONTAINMENT IS: E a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-29. <br />§2636] <br />PANEL MANUFACTURER: Veeder Root 490-30. MODEL #: TLS-350 490-31. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL #(S): 794380-323 490-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. E a. YES ❑ b. NO 490-34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES [-]b. NO 490-35. <br />-_._.-__..........._....- ........................ .... _-.......... -.- <br />�] 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§2636] <br />MLLD MANUFACTURER(S): 490-37. MODEL #(S): 490-38. <br />--- -.----- -__._.. _ _ ..._..._..-____.....__..._._.._....__.__..._................ _.._-____-_._... <br />® 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 CCR§26361 490-39. <br />ELLD MANUFACTURER(S): Red Jacket 490.40. MODEL #(S): CPT 49041. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 49042. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-43. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-44. <br />_.............. -- _ <br />❑ 4. PIPE INTEGRITY TESTING. 490.45. <br />90-46. <br />FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHERS eci 4 <br />TEST FRE4 <br />Q (Specify) a90-0-7.7. <br />❑ 5. VISUAL PIPE MONITORING. 490.48. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* 490.49. <br />__...._......................................__ __-_.-� -__-- * Allowed for monitortn of unburied emery encY generator fue ling only per HSC §25281 5@-„- <br />-_ <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. [23 CCR §2636(a)(3)]490.50. <br />._._.........-...._.......-_._..__.._._...__..................................................................... __......... ..............._.._--..._.__.......... _.__-_..._...._._._............. -...... -. <br />El 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br />... ---..........._ . _............. <br />❑ 99. OTHER (Specify)490-13. 490.12. <br />a.-_.. -.1 n_-_ 1 -4r c •r_'.0-___ car__.._._ n0- i0- -rmo <br />