Laserfiche WebLink
6. SECONDARY pIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer <br />® Industry Standard EJ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ®Pressure <br />❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />(Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />"; �`� l y`P�.}� )`` _�t� • .h 7r .d _ .—mss :i _ <br />t s:..,.rnx Piping Run #—� piping Run # Z - <br />Piping Material' Piping Run #aj Piping Run # <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />i ina-run isolation: <br />Wait time between applying <br />pressurehacuum/water and <br />startin test: <br />Test Starr Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Reducer Boots/Fittings Reducer Boots/Fittings Reducer <br />Soots/Fittings <br />10 minutes <br />11�1 4,5- <br />1 <br />S1 <br />t1Cii'1-C' <br />No detectable Loss <br />f3. Pass ❑ Fail <br />10 minutes <br />i'l U Irl e. <br />No detectable Loss <br />0 -Pass ❑ Fail <br />10 minutes <br />Yoorld" <br />No detectable Loss <br />--Q-Pass ❑ Fail <br />Reducer Boots/Fittings <br />10 minutes <br />No detectable Loss <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-tr or failed tests) <br />