Laserfiche WebLink
19255517888 Main Fax GETTLER RYAN INC 12 08:17 p.m. 01-11-2007 2111 <br />711.3 <br />MONITORING SYSTEM CLINFICATION <br />For Use By All Jurisdictions Within the State of California <br />Authority Cited. Chapter 6, 7, 1lealth and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Facility Name: __I4_rtA2__ - Bldg. No.:a jopl� <br />Site Address: 3 1 4 a ,'Gp rnC _1A__Xt1t_._ City: Sjnc f7D Zip: <br />Facility Contact Person: _ Contact Phone No.: <br />Make/Model of Monitoring System: 'rf-S r 3SDate of Testing/Servicing: x/20 /06 <br />B. Inventory of Equipment Tested/Certified <br />r -h....,, N.o t,- m indir2tr aneritir eouinment iasntcted/serviced: <br />Tank ID: F17:1 er's t'+1 <br />Tank ID: <br />❑ In -Tank Gauging Probe. Model: <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Annular Space or Vault Sensor, <br />Model: <br />Piping Sump / Trench Sensor(s). Model: 79 13 RPO --;.?3 <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill/ High -Level Sensor. Model: <br />1) Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Tank ID: <br />Tank rD- <br />❑ In -Tank Gauging Probe. Model: _ _ <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑ Piping Sump / Trench Sensor(s). Model: __. _ <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Scnsot(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />O Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Dispenser ID: <br />Dispenser ID: _ <br />XDispenser Containment Sensor(s). Model: Z g qj m – 3.23 . <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />O Shear Valve(s). <br />❑ Shear Valvc(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: _ <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Madel: _ <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). <br />Model <br />❑ Shear Valve(s). <br />❑ Shcar Valve(s). <br />❑Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Floats) and Chain(s). <br />'It the facility contains more tanKs or otspensers, copy mis roan. mcroue uuurmauun rur every mnK a,iu atspenser at the iacuity. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e,g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attachA a copy of the report; (check all that apply): ❑ Syst t -up Ll Alarm history report <br />Technician Name (print): (�ANfJ,Y R20�_w Signature: /lis <br />Certification No.: �} 2 / ? / _ License. No.: <br />Testing Company Name: C=M}Aier Gx4h f in C. Phone No.,.( 9.2 S_ ) S—S/ Y 7 7 7 <br />Site Address: _ Date of Testing/Servicing: 0-12o l td 6 <br />Page 1 of 3 03/01 <br />