Laserfiche WebLink
19255517888 Main Fax GETTLER RYAN INC 1' ,q:35 p.m. 01-11-2007 4/11 <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comnlete the following checklist: ^ /I///+- - <br />to the becuon ii, oeiow, ucacrnue 11— 4.... <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />. <br />f-,....,.1oto rt,o rnitnwina rhrrkiictc — N/ A- I.— <br />Cl Yes <br />No* <br />Has ail input wiring been inspected for proper entry and termination, including testing for ground faults? <br />R❑ <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />to the becuon ii, oeiow, ucacrnue 11— 4.... <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />. <br />f-,....,.1oto rt,o rnitnwina rhrrkiictc — N/ A- I.— <br />Cl Yes <br />O No* <br />For equipment start-up or annual equ ment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; 0 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />O Yes <br />❑ No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />O Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or wit ne correctea. <br />H. Comments: <br />Page 3 of 3 03101 <br />