Laserfiche WebLink
Emergency Shut-Off (ESO) Testing Results & Checklist <br /> Facility Information Contractor Information Test Results <br /> Site# 2186 Co.Name: FASTECH Date: 02/14/12 <br /> Addr. 3212 N.California St. Phone: 714-523-0194 <br /> Ci /St: Stockton,Ca Lead Tech: Isaac Anderson(Alltech Petro Inc. X PASS <br /> eMaint.W.O.# 98.06135 Name: or <br /> Passport#: FAIL(Next Day Repair Required) <br /> Signature: <br /> The objective of this test is to provide assurance that when the ESO switch is ac.ti d,.SII 4 coling custom circuits(turbines,and dispensers)are de-energized,and <br /> remain de-energized until they are reset manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br /> # The following information is to be completed. X To Select <br /> YesNo NIA <br /> SITE DATA <br /> 1 Number of ESO switches: 1 <br /> 2 Type of Switch I I Push Pull =JMonentary Plain light/Toggle I 10ther: <br /> f Momentary type,locate and identify re-set button <br /> 3 Type of Turbine Control Relay System Electrical Distribution Center <br /> Brown Box I Power Solution JCustom Fabricated I Carolina Box 10ther X <br /> 4 Type of Turbine Control Rela s: I Make Red Jacket Model ariable Speed Flow Control/ <br /> 5 Type of Line Leak Detection: Mechanical ELD/CPT 1PLLD X <br /> PERFORMANCE TEST <br /> 6 oes the shutdown power tote X <br /> 7 Does the ESO shutdown power to the TURBINES? X <br /> Is the 220 voltage tot e turbine relay removed either the line side or the motor side of the contacts or the col X <br /> 8 <br /> 9 re the DISPENSER A S clearly identified/labeled? X <br /> 10 Are the TURBINE SHEAKEHSclearly entified labeled? X <br /> 11 Are all the ESOs accessible and clearly identified/labeled? X <br /> Did the s function correctly de-energized from either the line side or the motor side of the contacts or the col X <br /> 12 <br /> If#12 is NO,briefly describe what was wrong: <br /> 12A <br /> How was it corrected: <br /> 12B <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the Site <br /> Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate circuit panel <br /> clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# <br /> POST TEST <br /> 11 Site's fueling system is fully operational. X <br /> 12 All equipment secured and any access ports,lids,enclosures are closed. X <br /> 13 All safety barricades,and any debris was been removed. X <br /> COMMENTS <br /> Submit completed copy with other documentation in E-Maintenance. <br />