Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br /> each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br /> and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br /> drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br /> be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br /> Installation Application pages 4-8 as necessary for a timely plan review): <br /> Remove existing Red Jacket CPT Controlers and install new Red Jacket <br /> constant pressure controller. Remove Red Jacket transducer and install Veeder <br /> Root transducer. Install new interface and output PLLD modules in Veeder <br /> Root and cold start to except new modules. Program Veeder Root and <br /> Configure to match existing tanks and sensors. Perform 3gph test on 87 <br /> and 91 line leak detectors. Perform functionality tests on all Veeder Root <br /> Equipment. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> qty 2 - Red Jacket flow control kits part # 330020-451 <br /> qty 2 - Veeder Root output module part # 330374-001 <br /> qty 2 - Veeder Root PLLD input module part # 330843-001 <br /> 3 <br />