My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 4:35:27 PM
Creation date
3/28/2019 8:40:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br /> each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br /> and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br /> drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br /> be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br /> Installation Application pages 4-8 as necessary for a timely plan review): <br /> Remove existing Red Jacket CPT Controlers and install new Red Jacket <br /> constant pressure controller. Remove Red Jacket transducer and install Veeder <br /> Root transducer. Install new interface and output PLLD modules in Veeder <br /> Root and cold start to except new modules. Program Veeder Root and <br /> Configure to match existing tanks and sensors. Perform 3gph test on 87 <br /> and 91 line leak detectors. Perform functionality tests on all Veeder Root <br /> Equipment. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> qty 2 - Red Jacket flow control kits part # 330020-451 <br /> qty 2 - Veeder Root output module part # 330374-001 <br /> qty 2 - Veeder Root PLLD input module part # 330843-001 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.