Laserfiche WebLink
SWRCB,January 2002 Page_8_of 8_ <br /> 9.SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:VISUAL Equipment Resolution: 1/16" <br /> s <br /> ffim ,. Spill Box#87(2) FILL Spill Box#87(2) Spill Box#91 FILL Spill Box#91 <br /> ;� VAPOR VAPOR <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 14.50" 14.50" 14.50" 15" <br /> Wait time between applying <br /> pressure/vacuum/waterand 10 MIN 10 MIN 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 11:00 AM 11:00 AM 11:00 AM 11:00 AM <br /> Initial Reading(RI): 1.5" FROM TOP 1.5"FROM TOP 1.5"FROM TOP 1.5" FROM TOP <br /> Test End Time: 12:00 PM 12:00 PM 12:00 PM 12:00 PM <br /> Final Reading(RF): 1.5" FROM TOP 1.5"FROM TOP 1.5"FROM TOP 1.5"FROM TOP <br /> Test Duration: 1 HR 1 HR 1 HR 1 HR <br /> Change in Reading(RF-Rj): 0 0 0 0 <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> VISUAL TEST <br />