Laserfiche WebLink
ATTACHMENT D: TIER II QUALIFIED FACILITY CHECKLIST ❑ NA <br /> TIER II QUALIFIED FACILITY PLAN REQUIREMENTS—40 CFR 112.6(b) <br /> 112.6(b)(1) Plan Certification: Owner/operator certified in the Plan that: ❑Yes ❑No <br /> (i) He or she is familiar with the requirements of 40 CFR part 112 ❑Yes ❑No DNA <br /> (ii) He or she has visited and examined the facility's ❑Yes [:]No DNA <br /> (iii) The Plan has been prepared in accordance with accepted and sound industry practices and ❑Yes ❑No [:INA <br /> standards and with the requirements of this part <br /> (iv) Procedures for required inspections and testing have been established ❑Yes [:]No ❑NA <br /> (v) He or she will fully implement the Plan ❑Yes <br /> ❑No ❑NA <br /> (vi) The facility meets the qualification criteria set forth under§112.3(g)(2) ❑Yes ❑No DNA <br /> (vii) The Plan does not deviate from any requirements as allowed by§§112,7(a)(2)and 112.7(d), ❑Yes [:]No [:INA <br /> except as described under§112.6(b)(3)(i)or(ii) <br /> (viii) The Plan and individual(s)responsible for implementing the Plan have the full approval of ❑Yes ❑No [:INA <br /> management and the facility owner or operator has committed the necessary resources to <br /> fully implement the Plan. <br /> 112.6(b)(2) Technical Amendments: The owner/operator self-certified the Plan's technical amendments ❑Yes ❑No ❑NA <br /> for a change in facility design, construction, operation, or maintenance that affected potential <br /> for a§112.1(b)discharge <br /> If YES • Certification of technical amendments is in accordance with the self-certification El Yes ❑No DNA <br /> provisions of 112.6 b 1 . <br /> (i) A PE certified a portion of the Plan (i.e., Pian is informally referred to as a hybrid Plan) ❑Yes [:]No []NA <br /> If YES The PE also certified technical amendments that affect the PE certified portion of the ❑Yes ❑No DNA <br /> Plan as required under§112.6 b 4 ii <br /> (ii) The aggregate aboveground oil storage capacity increased to more than 10,000 U.S. gallons ❑Yes No ❑NA <br /> as a result of the change <br /> If YES The facility no longer meets the Tier I/qualifying r because <br /> it exceeds f 01I U.S. gallons in aggregate rr es • . storage capacity. <br /> The owner/operator prepared and implemented a Plan within 6 months following the change ❑Yes [:]No DNA <br /> and had it certified by a PE under§112.3(d) <br /> 112.6(b)(3) Plan Deviations: Does the Plan include environmentally equivalent alternative methods or [:1 Yes ❑No ❑NA <br /> impracticability determinations for secondary containment? <br /> If YES Identify the alternatives in the hybrid Plan: <br /> Environmental equivalent alternative method(s)allowed under§1 12.7(a)(2); -]Yes —1 No DNA <br /> • Impracticability determination under§1 12.7(d) ❑Yes ❑No DNA <br /> 112.6(b)(4) . For each environmentally equivalent measure, the Plan is accompanied by a written ❑Yes [—]No [:]NA <br /> statement by the PE that describes:the reason for nonconformance, the alternative <br /> measure, and how it offers equivalent environmental protection in accordance with <br /> §112.7(a)(2); <br /> For each secondary containment impracticability determination, the Plan explains the ❑Yes [:]No ❑NA <br /> reason for the impracticability determination and provides the alternative measures to <br /> secondary containment required in §112.7(d) <br /> AND <br /> (i) PE certifies in the Plan that: <br /> (A) He/she is familiar with the requirements of 40 CFR Part 112 ❑Yes ❑No DNA <br /> (B) He/she or a representative agent has visited and examined the facility ❑Yes ❑No DNA <br /> (C) The alternative method of environmental equivalence in accordance with §112.7(a)(2)or the ❑Yes ❑No DNA <br /> determination of impracticability and alternative measures in accordance with §112.7(d) is <br /> consistent with good engineering practice, including consideration of applicable industry <br /> standards, and with the requirements of 40 CFR Part 112. <br /> Comments: <br /> "Note that only the person certifying the Plan can make the site visit <br /> Onshore Facilities(Excluding Oil Production) Page D-1 of June 2014 <br />