My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1340
>
1900 - Hazardous Materials Program
>
PR0519595
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 11:25:44 AM
Creation date
3/28/2019 11:21:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0519595
PE
1921
FACILITY_ID
FA0007099
FACILITY_NAME
DURAFLAME WEST
STREET_NUMBER
1340
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14530012
CURRENT_STATUS
01
SITE_LOCATION
1340 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2A <br /> U.S. ENVIRONMENTAL PROTECTION AGENCY <br /> R <br /> SUMMARY OF SPCC DEFICIENCIES <br /> Onshore Facilities(Excluding drilling, production and workover) <br /> Facility Name/Address: Yo.ItIm 'll; 64-Facility Start <br /> Inspector: �- Date: rr 2..�p! SPCC#: /5) io <br /> Citation Deficiency Plan Field <br /> 112.3(a) No Spill Prevention Control and Countermeasures Plan <br /> 112'3(d)' Plan not certified by a Professional Engineer (PE), not self-certified, or incomplete <br /> 112.6(a)(1) or(b)(1) <br /> 112.3(e)(1)or(2) Pian not maintained on site or not available for review <br /> 112.3(g) Plan self-certified (or Tier I template used)though not eligible <br /> 112.5(a) No plan amendment(s) after change in: design, construction, operation, or maintenance <br /> 112.5(b) No evidence of five year review of plan by owner/operator <br /> 112.5(c); Technical amendments(s) not certified by a PE or self-certified <br /> 112.6(a)(2)or(b)(2) <br /> 112.6(6)(2) PE certified portions of Plan not certified by a PE following technical amendments <br /> 112.6(b)(3) Deviations from the SPCC rule requirements are not certified by a PE <br /> 112.7 No signed management approval of plan <br /> 112.7 Plan does not follow sequence or have a cross reference <br /> 112.7(a)(2) No or inadequate environmental equivalent for deviations from requirements <br /> 112.7(a)(3) No or incomplete facility diagram <br /> 112.7(a)(3)(i) No or incomplete listing of type of oil and storage capacity of containers <br /> 112.7(a)(3)(ii) No or inadequate description of discharge prevention measures <br /> 112.7(a)(3)(iii) No or inadequate description of drainage controls <br /> 112.7(a)(3)(iv) No/inadequate description of countermeasures for discharge discovery, response, cleanup <br /> 112.7(a)(3)(y) No or inadequate description of disposal methods fbr recovered materials <br /> 112.7(a)(3)(vi) No or incomplete contact list&phone numbers for response & reporting discharges <br /> 112.7(a)(4) No or inadequate procedures for reporting discharges <br /> 112.7(a)(5) No or inadequate procedures for use in an emergency <br /> 112'7(6)or Plan has inadequate or no prediction of equipment failure which could result in discharges <br /> 112.6(a)(3)(i) <br /> 112.7(c) No or inadequate containment and/or diversionary structures to prevent a discharge <br /> 112.7(d) No or inadequate demonstration that secondary containment is impracticable <br /> 1 12 7(d) No periodic integrity and leak testing of containers, valves and piping when impracticability <br /> is claimed for bulk storage containers <br /> 112.7(d)(1) No or inadequate: contingency plan per 40 CFR part 109 or FRP under 112.20 <br /> 112.7(d)(2) No written commitment of manpower, equipment, and materials <br /> 112.7(e) Inspections and tests not in accordance with written procedures in Plan <br /> 112.7(e) Record of inspections are not signed by facility supervisor <br /> 112.7(e) Record of inspections are not maintained for three years <br /> 112.7(f)(1) No training of oil-handling personnel on discharge prevention <br /> 112.7(f)(2) No designated person responsible for spill prevention <br /> 112.7(f)(3) Spill prevention briefings are not conducted at least annually <br /> 112.7(g) No or inadequate description of facility security <br /> 112.7(h)(1) Loading/unloading rack drainage does not flow to containment <br /> 1 12 7(h)(1) Containment system does not hold at least the maximum capacity of the largest single <br /> compartment of any tank car or tank truck using the rack <br /> 112.7(h)(2) No interlocked warning light, physical barrier system, or warning signs to prevent vehicular <br /> departure before complete disconnect from transfer lines <br /> Deficiencies found during the inspection are marked with an "X" <br />
The URL can be used to link to this page
Your browser does not support the video tag.