My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:29:09 PM
Creation date
3/28/2019 2:24:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Aq J II N. <br /> •' O <br /> i?' � 'O• SAN JOAQUIN COUNTY <br /> Q. ENVIRONMENTAL HEALTH DEPARTMENT <br /> y.ICA 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> 7. Telephone: (209) 468-3420 Fax:(209) 468-3433 Web:www.sigov.orp/ehd <br /> 9.CiFpRN <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Datq: <br /> Facility Address: Service Request#: <br /> 3Zl'2 N, a St, to� S'R00--7g1�3q <br /> Onsite Service Technician's Name: ICCService echnic' xp. Date: Manufacturer Trainin <br /> OFU-) 1C)hdf=Q <br /> SERVICE SERVICE <br /> Leak detector <br /> [I mechanical Model: Spill bucket El minimum 5 gallon <br /> ❑ El❑ electronic Serial #: ❑ 1 hour hydrostatic ElIncon TS-STS <br /> El line test programmed <br /> El Caldwell System ❑ Other <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ ❑ mechanical Model: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial #: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> sensor Primary piping testing at: <br /> ❑ ❑ positive shutdown Model: ❑ psi <br /> ❑ fail safe Serial #: minutes <br /> ❑ NA <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial #: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial #: Note: Please be aware that 20 containment components are required to be tested upon <br /> ❑ NA installation.6 months after,and every 36 months thereafter. <br /> XVI�Mrop tube with mechanical overfill at �3 ❑ Cold start of monitoring panel <br /> XI Drop tube with mechanical overfill ato�3�e El Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) Other: see below lZempy4 of b r l <br /> This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> bail <br /> 4 3v <br /> 6 <br /> 1 <br /> 4212 <br /> is #7 t kn� a- a,&&,W- T6`-0 Wd. <br /> THIS FACILITY IS SUBJECT TO REINSP ION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspecr: R ed By: <br /> ( Title: <br /> EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 4/30/12 Cj <br />
The URL can be used to link to this page
Your browser does not support the video tag.