My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 9:31:45 AM
Creation date
3/29/2019 9:20:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
waste. If the leak cannot be corrected the spill contain- Height Adjustment Bolt <br /> er or bellows should be replaced. � <br /> As an alternate to a hydrostatic test a vacuum test can be <br /> performed on the spill container. Using OPW DW-VAC- <br /> TEST and SC-TEST, perform a vacuum test on the spill con- <br /> tainer. An initial vacuum of 1 S" of water should be attained <br /> and the spill container must retain a vacuum of at least 12" 4• Shims <br /> of water after 5 minutes. (See DW-VAC-TEST Instructions.) Cap -- <br /> Step 9: (See Figures 2 & S) <br /> Before pouring concrete, place plastic over the cover and <br /> Mounting Ring protecting them from concrete splash . Adaptor <br /> Double check that the unit is level and at proper grade <br /> height. Pour concrete per Figure 5 . Ramp or dome the Figure <br /> concrete away from the mounting ring . <br /> There should be a minimum of 1 " slope to finish grade. Slope 1 " Down From Top of Mounting Ring <br /> NOTE: Do not stand on spill container before concrete sets <br /> up• Finish Grade <br /> Remove plastic from cover after concrete has dried . Remove <br /> adjustment system . Re-test the spill containers for leaks as � `' +,+: +;• : . <br /> described in Step 8, after the concrete has set up <br /> Operation and Maintenance: <br /> y . . • �1:�. • +tea . r iii . t '��:��. <br /> After each fuel delivery, the operator must remove any stand- ` Ni Now ` 4i` ` ` •` ` •` ' • ` •' <br /> Ing fuel from the container. Fuel can be removed by actuat- Z a .z <br /> ing the drain valve or with a gasoline absorbing disposable , .,�`� , i .1 . � `tiw, . ` tti++` ' .. `y'i`IN <br /> towel. If access to drop tube or overfill valve is required re- . � . 3 � ,•, .t � <br /> move Nipple Adaptor from primary bucket. a Z . . . .: a v . <br /> ,�>•,, � • � � �.,. + • . ty'a•; . .a��. ,I NI <br /> I IL IN <br /> Weekly: Perform a visual inspection of the interior of the con- <br /> tainment bucket for water or other contaminants. If water or Figure s <br /> other contaminants are found they must be disposed of with <br /> disposable towels. Dispose of towels safely and per all appik <br /> cable local, state and federal codes. Check that cover is in <br /> NIN <br /> good condition and properly identified . Replace cover and s <br /> seal as necessary. Inspect the bucket walls for cracks, bulges lip <br /> or holes. If any exist, have that spill container barricaded and r" Min Clearance <br /> contact maintenance personnel immediately for repairs . ; , <br /> NOTE: The bellows and base on the spill container can be <br /> ® "c�t ` o x C <br /> replaced if damaged. } a 1 IT <br /> �" <br /> Semiannually: Follow all state and local required hydrostaticB <br /> or vacuum testing on the buckets. Inspect and clean the inte- <br /> rior of the spill container and drain valve screen . Remove ac- =fx � . A <br /> cumulated dirt and grit. Where applicable, test the drain <br /> valve using CARB procedure TP-201 . 1 C or TP-201 . 1 D. If the 17a7" <br /> drain valve passes testing no further maintenances required . If Ref <br /> r } d <br /> the drain valve fails testing, remove the valve, soak in waterYY <br /> JY <br /> and use high-pressure air, if needed, to clean . Reinstall the i - -- <br /> drain valve to its proper position and where applicable, test INA <br /> the valve with CARB procedure TP-201 . 1 C or TP-201 . 1 D. <br /> if �� I <br /> problems persist, replace the drain valve with P/N 1 DK-2100- If <br /> EVR (specified torque 11 .5 ft- lbs min to 13 .5 ft-lbs max, 5/ 16- - ---� --� <br /> 18 UN thread) . The sealable cover 0 SC) adjustment nut is set 1 <br /> at the factory, but due to environmental conditions it may be 7 <br /> necessary to adjust it to either improve sealing or ease cover Length of Nipple = Dimension A - Dimension B - Dimension C - 2" Min <br /> removal . Figure 6 <br /> IMPORTANT: Leave these instructions with the Station <br /> Operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.