My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:51:10 AM
Creation date
3/29/2019 10:37:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oPa,u I,N,,.c <br /> SAN JOAQUIN COUNTY <br /> Q. x ENVIRONMENTAL HEALTH DEPARTMENT <br /> y $ > ?. 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> iP Telephone:(209) 468-3420 Fax:(209) 468-3433 Web:www.s*gov.org/ehd <br /> 9L%FpR� <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facilit ame: Inspection Date: <br /> .Q, -Tr ux)--11 Q�tl u -, <br /> Facility A ress: Service Request#: <br /> Cv-- C 0 (-cis C)X q-0 <br /> Onsite Service Technician's Name: ICC rvi_-T-_hniclaMnstaller Exp.Date: Manufacturer Training: <br /> SERVICE SERVICE <br /> Leak detector AuC—� Spill bucket minimum 5 gallon <br /> ❑ mechanical Model: K7 <br /> El El electronic Serial 1 hour hydrostatic El Incon TS-STS <br /> #: <br /> ❑ line test programmed <br /> El Caldwell System Other d,( h <br /> Leak detector �e <br /> u Spill bucket ) minimum 5 gallon <br /> F-1 11 <br /> mechanical Model: 1 hour hydrostatic Incon TS-STS <br /> 11 electronic Serial #: � El <br /> Caldwell System �ryOther <br /> El line test programmed 7� <br /> sensor Primary piping testing at: <br /> ❑ ❑ positive shutdown Model: ❑ psi <br /> ❑ fail safe Serial #: minutes <br /> ❑ NA <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial #: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial #: Note: Please be aware that 2°containment components are required to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> ❑ This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> Q97-7 Q, <br /> c <br /> N I - <br /> Vill CD <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Insp c or: ReceivBy: Title: <br /> �.n� c 4,f, I /---, , <br /> EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 4/30/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.