My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:51:10 AM
Creation date
3/29/2019 10:37:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 3633 Duck Creek Drive, Stockton, CA 95215 <br /> T3:Old Oil <br /> SoAnnuter <br /> Sump � <br /> Mechanic <br /> . . . . . . Shop <br /> Overfill <br /> Alarms <br /> Console <br /> . . . . . . . . . . . . . <br /> T1:Diesel <br /> Canop� <br /> STP O Fill O Annular <br /> 3/4 4 T'2:.Diesel Reserve Office <br /> Kiosk <br /> STP Fill 0-Annular <br /> Transition <br /> Box for oil piping T3:New Oil <br /> GFillPump <br /> 00 Annular. <br /> 1 1/2 2 <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn: 1/15/2019 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br /> System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following <br /> equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br /> containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used <br /> for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Page 4 of 4 <br /> UN-036—4/4 "-w.unidecs.org Rev.01/17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.